24th FEBRUARY 2025
HPBC DEVELOPMENT CONTROL COMMITTEE
UPDATES REPORT
ITEM 1 – HPK/2023/0442 – Carpenters, Dinting Lodge, Glossop
HPBC Landscape Consultant
20.01.25
The Council’s Landscape Consultant has provided further commentary regarding potential visual impacts to the Peak District National Park (PDNP) with regard to the applicant’s original and revised Landscape Visual Impact Assessment (LVIA) and proposed landscape mitigation measures for the solar array scheme as follows:
“I considered that the original LVIA did not adequately assess potential visual impacts from the PDNP and as requested this was included in the revised LVIA. I agreed with these assessments made of visual impacts from within the PDNP as being Minor Moderate but also commented on the need for mitigation and further details of proposals for this.
Mitigation proposals including hedgerow and tree planting were included on the landscape proposals plans and I considered that these would help reduce visual impacts from close to the site as well as more distant views. I also suggested the possibility of including additional planting to the northwest of the site as stated below:
“As per my previous email I consider that some tree planting is required at the western edge of the site adjacent to the existing factory, I realise this would compromise existing grassland but consider it would be helpful to reduce visual impacts from distant views from the PDNP”.
However, due to engineering constrains the additional planting was not included on the Landscape Plans. The request for additional planting should be considered in the context that potential visual impacts were not considered great and that the mitigation proposals do include tree and hedgerow planting to the southeast boundary. Visual impacts assessed by the revised LVIA for views from The Pennine Bridleway within the PDNP, with which I agree were considered to have Magnitude of Effect of Very Small and Overall Level of Effect of Minor Moderate Adverse. I consider that visual impacts will be reduced further by the proposed mitigation. Therefore, whilst additional planting was considered desirable and could further reduce visual impacts, I consider that the degree of harm to the PDNP from visual impacts by the proposed development would still be acceptable with the implementation of the mitigation proposals as per the Landscape Masterplan, Figure L1 (312614-ADW01-Final.revC-ILEMP)”.
Derbyshire Fire and Rescue Service
14.02.25 No objections to the erection of solar array, supporting energy infrastructure and associated site works subject to the following:
Access for emergency service vehicles, both during the demolition and construction phases of the proposal, should be provided in accordance with Approved Document B (Vols 1 and 2) Section B5. Site details should be provided to Derbyshire Fire and Rescue Service with contact details and expected timeframes for the build.
Environment Agency
Awaited.
Historic England
Awaited.
Agent
In further detail, the applicant has quantified the benefits of the solar scheme as follows:
Provision of 15.5% onsite factory demand (with the remaining 84.5% imported) Solar Consumed by the factory would be 91.3% with 8.7% exported to the grid Annual Generation @ 1,025 MWh Carbon emissions reduction on site due to solar @ 16,150 KgCO 2 Total Carbon emissions reduction due to solar: 127,160 KgCO 2
Case Officer
Erratum: paragraph 7.52 ‘Rev B’ should read ‘Rev C’.
Section 245 (Protected Landscapes) of the Levelling-up and Regeneration Act 2023 (LURA) amends the duty on relevant authorities in respect of their functions which affect land in National Parks, National Landscapes, and the Norfolk and Suffolk Broads (collectively referred to as Protected Landscapes) in England.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update SheetReport | 299 KB | DownloadRead as text |
Follow Development Control Committee at High Peak and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Aug 2026 | Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. | Approved | Open |
| 10 Aug 2026 | Update SheetThat the update sheet be noted. | Noted | Open |
| 10 Aug 2026 | Planning ApplicationsThat the report be noted. | Noted | Open |
| 10 Aug 2026 | HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... | Approved | Open |
| 10 Aug 2026 | HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.