High Peak Borough Council
Development Control Committee, Monday 24 February 2025 at 1.30pm

5 Year Housing Land Supply Update

Noted Planning 1 paper

Development Control Committee noted this item on Monday 24 February 2025. Below is the council's own wording, with the papers it was decided on.

Item25/90

Resolved

That the content of the report be noted and the updated position on 5 year housing land supply be made available on the Council’s website.
Word for word from the decision High Peak published for this meeting. Source: democracy.highpeak.gov.uk

Follow this further

Built from High Peak's papers

What the report saysPro

Report to Development Control Committee

Recommendation

2.1That the Committee notes the content of this report and the updated position on 5 year housing land supply is made available on the Council’s website.

Background

3.1On 12 December 2024 the Government announced an overhaul of the planning system to accelerate housebuilding and aim to deliver 370,000 new homes a year. Under new planning rules, updated by the National Planning Policy Framework (NPPF) Councils are required to play their part to meet housing need, with new immediate mandatory minimum housing targets for councils to ‘ramp up’ housebuilding and deliver growth across the county.

Standard Method

3.2Changes included revisions to the ‘standard method’ set out in the National Planning Practice Guidance. The ‘standard method’ for calculating local housing need provides a minimum number of homes to be planned for. Local authorities should use the standard method as a starting point when preparing the housing requirement in their plan unless exceptional circumstances justify an alternative approach.

3.3The new standard method aims to boost housing numbers by pinning targets to existing housing stock (rather than household projections, as per the former method) and then uplifting needs, and the target, based on affordability (using a three-year average). The two stage method includes:

 Setting a baseline using 0.8% of existing housing stock for the area.  Adjusting to take account of affordability. The baseline figure is then adjusted using an adjustment factor calculated using the five-year average affordability ratio.

3.4The purpose of the 5 year housing land supply is to provide an indication of whether there are sufficient sites available to meet the housing requirement set out in adopted strategic policies for the next 5 years. Where strategic housing policies within the Local Plan are more than 5 years old, or have been reviewed and found in need of updating, local housing need calculated using the ‘standard method’ should be used in place of the housing targets within the Local Plan.

Housing Delivery Test

3.5The Housing Delivery Test is a measure prepared by Government detailing whether planned requirements (or, in some cases, local housing need) have been met over the last 3 years. This measure is used to determine what level of additional ‘buffer’ needs to be added to the requirement when calculating the 5 year housing land supply figure.

Buffer

3.6To ensure that there is a realistic prospect of achieving the planned level of housing supply, the NPPF requires local planning authorities to add an appropriate buffer, applied to the 5 year requirement. This will result in a requirement over and above the level indicated by the strategic policy requirement or the local housing need figure. Depending on the circumstances:  5% - the minimum buffer for all authorities, necessary to ensure choice and competition in the market; or  20% - the buffer for authorities where delivery of housing taken as a whole over the previous 3 years, has fallen below 85% of the requirement, as set out in the last published Housing Delivery Test results; or  From 1 July 2026, 20% where a local planning authority has a housing requirement adopted in the last five years, which was examined against a version of the NPPF published before 12 December 2024, and where their annual average housing requirement is less than 80% of the most up to date local housing need figure as calculated using the standard method, set out in national planning guidance.

High Peak Local Plan

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
5 Year Housing Land Supply UpdateReport 134 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 22 attended
RM
Councillor Robert McKeownChair, present
DL
Councillor David LomaxVice-Chair, present
AB
Councillor Alan BarrowCommittee Member, present
SE
Councillor Simon EvansCommittee Member, present
CF
Councillor Charlotte FarrellCommittee Member, present
SG
Councillor Stewart GardnerCommittee Member, present
AH
Councillor Adrian HopkinsonCommittee Member, present
IH
Councillor Ian HuddlestoneCommittee Member, present
PR
Councillor Peter RobertsCommittee Member, present
JT
Councillor Jean ToddCommittee Member, present
GS
Councillor Gillian ScottCommittee Member, apologies
LG
Councillor Linda GroobyCommittee Member, present

All 22 on the meeting page

On this subject at High Peak

Search all
  1. 5 Year Housing Land Supply UpdateThis decision
  2. HPK/2019/0020 - Land North of Saint Mary''s Catholic School, Cliffe Road, Glossop - Erection of 38 unit housing scheme and all associated car parking, landscaping and highway worksRefused
  3. HPK/2016/0548 - Land North of Dinting Road, Glossop - variation of condition 41 (Affordable Housing) on planning permission HPK/2015/0692Approved

More from High Peak Development Control Committee

All decisions
MeetingDecisionOutcome
10 Aug 2026 Minutes of the previous meetingThat the minutes of the meeting held on 13 July 2026 be approved as a correct record. Approved Open
10 Aug 2026 Update SheetThat the update sheet be noted. Noted Open
10 Aug 2026 Planning ApplicationsThat the report be noted. Noted Open
10 Aug 2026 HPK/2026/0134 - The Natural Baths, The Crescent, BuxtonThat the application be approved as set out in the report, subject to the amended condition from DCC Archaeology as s... Approved Open
10 Aug 2026 HPK/2026/0184 - Buxton Opera House, Water Street, Buxton, DerbyshireThat Listed Building Consent be granted as set out in the report: 2. That in the event of any changes being needed to... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies