That authority be delegated to the Head of Development Services, in consultation with the Chair, to approve the application as set out in the report, subject to: a. The conditions as set out in the report; b. No material objections arising from outstanding consultee responses from both the Environment Agency and Historic England; and c. An additional condition to provide badger gates as recommended by Derbyshire Wildlife Trust 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/informatives/planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
24th February 2025
Application HPK/2023/0442 No: Location Carpenter Plc, Dinting Lodge Industrial Estate, Dinting, Glossop Proposal Proposed solar array, supporting energy infrastructure and associated site works incorporating, access, security fencing and landscape planting. Applicant Centrica Agent Arthian Parish/ward Glossop Ward Date registered: 18.10.23 If you have a question about this report please contact: Rachael Simpkin, Tel. 01298 28400 extension 4922, [email protected]
SUMMARY OF RECOMMENDATION
APPROVE with conditions
The scheme has been time extended in agreement with the applicant to address matters principally relating to ecology and landscape.
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee as the proposal constitutes major development exceeding 1.0 hectare (ha).
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The 2.35 ha application site comprises a substantial area of greenfield land immediately to the southeast of a large industrial factory operated by Carpenter PLC, who manufacture, store and distribute polyethylene foam, processed fibre and related products. The southern portion of the site falls within the adopted Local Plan (LP) built-up area boundary of Glossop and lies adjacent to the Dinting Lodge Primary Employment Zone. In contrast, the northern portion of the application site is located within both the LP countryside and green wedge. Furthermore, the application site both falls within and adjoins the Dinting Lodge Grassland Wildlife Site. Derbyshire Historic Environment Record (HER) ref. MDR2446 “Woodhead Railway (mainly dismantled), Charlesworth and Glossop” lies some 225.0 metres to the southeast of the application site. Whilst the Peak District National Park (PDNP) boundary lies c.2.0 to the north / northwest of the site. 2.2 Notably, the site slopes steeply towards the factory in a northwest direction, with the lower embankment retained and regraded in association with planning permission ref. HPK/2009/0496, including its non-material amendments. The northern boundary of the site is open, with the other boundaries defined by fencing. To the north and east, it is bordered by woodland, whilst there are several ponds in the vicinity.
2.3The application site lies partly within County DCCTPO 61. However, this element of the site does not contain any trees in relation to development associated with HPK/2009/0496. The approved ‘Woodland and Creation Scheme’ associated with the consent secured the application site area for high value grassland mix planting.
2.4The site lies to the east of the Dinting Lodge Industrial Estate. The immediate context is industrial to the west, with the nearest residential area on Dinting Road located c.150.0m from the solar array to the north. Towards the east and south, there is woodland interspersed with agricultural fields.
2.5The A57 is located directly to the west of the site and Dinting Road is located to the east of the application site. The Public Right of Way (PRoW) is designated as Glossop FP189 and extends in a southeast direction from Dinting Road through the site to join PROW Glossop FP62 running in a north-south axis on the east side of the site amongst others.
2.6Other local plan designations include Dinting Lodge Landfill, Aerodrome Safeguarding Map for Manchester Airport and the application site falls partly within the Coal Authority defined Development High Risk Area.
3. DESCRIPTION OF THE PROPOSAL
3.1Full planning permission is sought for a solar photovoltaic (PV) array with associated infrastructure on land at Carpenter Ltd, Dinting Lodge over a 40-year life period. It would comprise of the following operational elements including: solar PV arrays; inverters; transformer; onsite cabling and maintenance tracks.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.