RESOLVED that following schemes be included in the planned maintenance programme for 2010/11 – Footway Priority Location Details Estimate Running Total 1. Frimley Road Between 16 and 86 (Even Side only) – Reconstruct and strengthen bitmac. £19,650 £19,650 2. Gilders Road Between Filby Road and Billockby Close – Replace existing slabs to bitmac. £10,000 £29,650 3. Frimley Road Between 19 and 63 (Odd Side only) – Replace existing slabs to bitmac. £19,150 £48,800 4. Stormont Way Whole length (Both Sides) – Replace existing slabs to bitmac. £60,000 £108,800 Reason for decision So that the maintenance works programme for 2009/10 can be determined and officers are able to proceed with its management and implementation.
Word for word from the decision Kingston upon Thames published for this meeting.Source: moderngov.kingston.gov.uk
This report informs the Committee of the outcome of 2009/10 Planned Maintenance Programme and the latest performance indicators in relationship to the condition of carriageways and footways for the Borough and the Neighbourhood. In 2010/11 the funding available for Neighbourhood planned maintenance schemes will remain at the same level as 2009/10, i.e. £104,900 for planned footway and carriageway maintenance schemes. From assessments based on UKpms condition surveys, those works considered to be of the highest priority are listed in ANNEX 1 to the report which will be made available as late material at the meeting.
Recommendation
It is RECOMMENDED that the Committee determine, within budgetary limits, the works they wish to be to be undertaken as part of the 2010/11 maintenance programme and to nominate reserve schemes, as appropriate, from the prioritised lists in ANNEX 1
REASON FOR RECOMMENDATION So that the maintenance works programme for 2009/10 can be determined and officers are able to proceed with its management and implementation.
Background
2009/2010 Programme
1. The following schemes were undertaken, within the Neighbourhood, as part of the 2009/2010 planned maintenance programme:-
Footway
Priority Location Details 1. Devon Way Whole road – replace slabs with bitmac 2. Chantry Road Mount Road to No.116 – replace slabs with bitmac 3. Church Rise Whole road – replace slabs with bitmac
Carriageway
Priority Location Details 4. Roebuck Road Chantry Road to width restriction – plane and resurface E2
National Performance Indicators
2. The Council was obliged to publish BVPI’s (Best Value Performance Indicators) for Principal (223), Non-principal Classified and Unclassified Roads (224 a and b) and for Class 1 & 2 Footways (187). The prescribed method to use for the surveys and analysis was UKpms (United Kingdom pavement management system). BVPI 223, for Principal Road carriageways, was based upon the London-wide SCANNER survey commissioned by TfL as part of the Road 2000 Project. For BVPI 224 a & b and BVPI 187 UKpms surveys were commissioned and funded by the Borough.
3. 2007/08 was the last year of the BVPI’s and these have been replaced by a reduced number of National Indicators (NI’s). From 2008/09, only the condition indicators for Principal Road carriageways and Non-principal Classified Road carriageways were required to be reported externally. However, to monitor local performance and to assist in the Council’s asset management, UKpms surveys have and will continue to be undertaken for the whole network. The results of the surveys will be analysed and used to produce RBK Key Indicators to monitor the condition trends for both the Borough as a whole and for each Neighbourhood.
4. The table below shows the Borough’s BVPI and NI performance indicators for the past years:
5. The UKpms results for the Neighbourhood’s network (excluding Principal Roads) are:
Carriageways = 9.0% Footways = 34.0%
The figures show the percentage of the network that is above the national threshold for further investigation/works, i.e. the lower the figure the better the condition.
Assessment Criteria for Prioritising Schemes
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow the Borough Neighbourhood Committee at Kingston upon Thames and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.