Planned Highways Maintenance 2010/11

Decided Committee 1 paper

Maldens and Coombe Neighbourhood decided this item on Wednesday 3 February 2010. Below is the council's own wording, with the papers it was decided on.

Item15

Resolved

RESOLVED that the following works be undertaken as part of the 2010/11 maintenance programme (with a reserve scheme nominated as shown): 1) C169 - Galsworthy Road [A238 Coombe Road to A308 Kingston Hill outside Kingston Hospital – plane & resurface] £106,000 2) Portland Avenue[whole length - both sides – relay / renew slabs and reconstruct bitmac verge] £59,700 Reserve scheme: Queens Road Kingston Hill to Kingston Gate [even side- relay/ renew slabs and reconstruct bitmac verge] £15,300 Reason for decision So that the maintenance works programme for 2009/10 can be determined and officers are able to proceed with its management and implementation.
Word for word from the decision Kingston upon Thames published for this meeting. Source: moderngov.kingston.gov.uk

Follow this further

Built from Kingston upon Thames's papers

What the report saysPro

Report to Maldens and Coombe Neighbourhood

Summary

This report informs the Committee of the outcome of 2009/10 Planned Maintenance Programme and the latest performance indicators in relationship to the condition of carriageways and footways for the Borough and the Neighbourhood. In 2010/11 the funding available for Neighbourhood planned maintenance schemes will remain at the same level as 2009/10, i.e. £169,900 for planned footway and carriageway maintenance schemes. From assessments based on UKpms condition surveys, those works considered to be of the highest priority are listed in ANNEX 1 to the report.

Recommendation

It is RECOMMENDED that the Committee determine, within budgetary limits, the works they wish to be to be undertaken as part of the 2010/11 maintenance programme and to nominate reserve schemes, as appropriate, from the prioritised lists in ANNEX 1

REASON FOR RECOMMENDATION So that the maintenance works programme for 2009/10 can be determined and officers are able to proceed with its management and implementation.

Background

2009/2010 Programme

1. The following schemes were undertaken, within the Neighbourhood, as part of the 2009/2010 planned maintenance programme:-

Footway

Priority Location Details 1. Parkgate Close Whole length – replace bitmac 2. Hughenden Road Whole length – replace bitmac and strengthen f/way parking exemption areas 3. Chilmark Gardens Whole length – relay/renew slabs 4. Hollington Crescent Whole length – relay/renew slabs

Carriageway

Priority Location Details 5. Egerton Road Whole Road – Plane and Resurface 6. Parkgate Close Whole Road – Plane and Resurface 7. Coombe Road Between Lime Grove and Sycamore Grove – localised full depth reconstruction of carriageway – no full width resurfacing G2

National Performance Indicators

2. The Council was obliged to publish BVPI’s (Best Value Performance Indicators) for Principal (223), Non-principal Classified and Unclassified Roads (224 a and b) and for Class 1 & 2 Footways (187). The prescribed method to use for the surveys and analysis was UKpms (United Kingdom pavement management system). BVPI 223, for Principal Road carriageways, was based upon the London-wide SCANNER survey commissioned by TfL as part of the Road 2000 Project. For BVPI 224 a & b and BVPI 187 UKpms surveys were commissioned and funded by the Borough.

3. 2007/08 was the last year of the BVPI’s and these have been replaced by a reduced number of National Indicators (NI’s). From 2008/09, only the condition indicators for Principal Road carriageways and Non-principal Classified Road carriageways were required to be reported externally. However, to monitor local performance and to assist in the Council’s asset management, UKpms surveys have and will continue to be undertaken for the whole network. The results of the surveys will be analysed and used to produce RBK Key Indicators to monitor the condition trends for both the Borough as a whole and for each Neighbourhood.

4. The table below shows the Borough’s BVPI and NI performance indicators for the past years:

2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 Principal = N/A 9.0% 8.0% 4.0% 5.0% 2.0% Non-princ Class. = 14.1% 8.8% 10.0% 4.0% 8.0% TBC Unclassified = 11.7% 7.8% 8.0% 9.0% 13.0% 13.0% F/ways Class 1 & 2 = 23.0% 38.0% 34.0% 30.0% 20.0% 23.0% F/ways Class 3 & 4 = N/A N/A N/A 51.0% 37.0% 46.0%

5. The UKpms results for the Neighbourhood’s network (excluding Principal Roads) are:

Carriageways = 17.0% Footways = 31.0%

The figures show the percentage of the network that is above the national threshold for further investigation/works, i.e. the lower the figure the better the condition.

Assessment Criteria for Prioritising Schemes

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Planned Highways Maintenance 2010/11Report 85 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 14 attended
AM
AMSON MickMember, present
CP
CODD PatrickChair, present
DE
Councillor David EdwardsMember, present
FD
FRASER, DavidMember, present
HA
HOLDER AdrianMember, present
HE
HUMPHREY, EricMember, present
JS
JAMES Simon AlexanderMember, present
HJ
Councillor Howard JonesMember, present
DJ
Councillor Don JordanMember, apologies
IM
Councillor Ian McDonaldMember, present
DO
Councillor Derek OsbourneMember, present
SK
SMITH, KenVice-Chair, present

All 14 on the meeting page

On this subject at Kingston upon Thames

Search all
  1. Planned Highways Maintenance 2010/11This decision
  2. Planned Highways and Street Lighting Capital Programme 2022/23Noted
  3. Planned Highways Maintenance 2010/11Agreed
  4. Planned Highways Maintenance 2010/11Decided
  5. Planned Highways Maintenance 2010/11Decided
  6. Planned highways maintenance 2006/7Deferred

More from Kingston upon Thames Maldens and Coombe Neighbourhood

All decisions
MeetingDecisionOutcome
17 Mar 2022 Community GrantsResolved that – 1. that the application from the Zoological Society of London - Kingston HogWatch, for the sum of £3,... Approved Open
17 Mar 2022 Objection to traffic management order for the introduction of disabled bay on Gooding CloseResolved that – 1. the comments and objections received, summarised in paragraphs 4 and 5, and officer comments in pa... Noted Open
17 Mar 2022 Coombe Estate Highway Maintenance Estimates 22_23Resolved that the maintenance estimates for the Coombe Estate Roads, as set out in the Annex 1 to the agenda report, ... Approved Open
22 Sep 2021 Neighbourhood GrantsRESOLVED that the - Allocation of £2,916 of Neighbourhood Community Grant funding To Voices of Hope ( VoH ), a Kingst... Decided Open
24 Jun 2021 Appointment of the Chair and Vice-ChairRESOLVED that Councillor Simon Edwards be appointed Chair and Councillor Lesley Heap be appointed Vice-Chair for the ... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies