Cabinet, Tuesday 1 October 2013 at 3.00pm

Solar Photovoltaic Energy Systems

Approved Executive 1 paper

Cabinet approved this item on Tuesday 1 October 2013. Below is the council's own wording, with the papers it was decided on.

Item9

Resolved

158/2013 The Cabinet recommended that Full Council approve a funding envelope for the scheme by adding £230,000 to the capital programme. 159/2013 The Cabinet delegated authority to the Assistant Director of Legal and Corporate Services, in consultation with the Portfolio Holder for Finance, to enter into the necessary feed-in tariff contractual arrangements and procure the installation of Solar Photovoltaic systems at Gun Wharf and Medway Tunnel using prudential borrowing on the best terms reasonably obtainable, subject to Full Council first agreeing to amend the capital programme to fund the scheme as set out in paragraph 8.1.1 of the report. Reasons: The installation of Solar PV will not only generate energy and savings, but also reduce the Council’s carbon footprint.
Word for word from the decision Medway published for this meeting. Source: democracy.medway.gov.uk

Follow this further

Built from Medway's papers

What the report saysPro

Report to Cabinet

Background

2.1Solar PV (Photovoltaic) energy generation is a proven technology, which converts energy from the sun into useable electrical energy.

2.2Since 2010, the government has encouraged the installation of small-scale electricity generation through a subsidy known as the feed-in tariff. This guarantees a payment to small renewable installations, which reduce carbon emissions and pressure on the national grid by generating electricity. A payment of around 12p is made for each kilowatt hour (kWh) of electricity produced regardless of whether or not the electricity is used by the generator or exported to the grid.

2.3It is proposed to install a 30kW peak power (kWp) scheme at the Medway tunnel and a 108kWp scheme at Gun Wharf. It is anticipated all the energy generated by both systems will be used on site and offset an element of current supply requirements and costs.

2.4The annual costs of electricity at the two sites are £450,000 at Gun Wharf and £170,000 at Medway Tunnel. The arrays of solar panels at these key Council buildings will generate a total of around 130,000 kWh of electricity with a financial benefit to the Council of £27,500 per annum comprising of energy savings and feed-in tariffs. The payback of the scheme is in the region of 10-years and the net saving over a 20-year period will be in the region of £350,000 based on current energy prices. The capital cost of the installations is estimated to be £230,000, which if approved will be funded through prudential borrowing.

Options

3.1There may be other buildings within the Council’s portfolio where Solar PV installations are a viable option, but these two sites have been chosen for a combination of reasons including: technical suitability; anticipated payback period; location; aesthetic impact and the quantity and consumption pattern of the electricity used on site.

3.2At Medway Tunnel it is proposed only to install panels onto the south-facing roof of the control building.

3.3The pitch and number of south facing roofs at Gun Wharf lend themselves to a relatively straightforward solar PV installation, which will be barely visible from the public highway and considered complementary to the style of the building.

4 Advice and analysis

4.1The installation of Solar PV will reduce the Council’s consumption of electricity from the grid and will also reduce carbon dioxide emissions by approximately 70 tonnes per annum.

Risk management

Risk Description Action to avoid or Risk mitigate risk rating Change of feed-in Over recent years Keep abreast of D2 tariff government has reduced the changes to tariffs and feed-in tariff. At first sharply, seek contractual but recently by smaller commitment as soon as increments practical. Energy Buildings with poor energy Ensure overall energy D2 performance of ratings receive a lower feed- performance of building building in tariff. is improved and that the best rate of feed-in tariff is achievable. Planning The proposal does not Early engagement with C2 benefit from permitted the development control development rights and an team. application for planning permission is refused 6 Consultation

6.1The relevant directorates have been consulted and no objections have been received.

7 Financial and legal implications

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Solar Photovoltaic Energy SystemsReport 23 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 17 attended
RC
Councillor Rodney Chambers, OBE (Con)Committee Member, present
AJ
Councillor Alan Jarrett (Con)Committee Member, present
DB
Councillor David Brake (Con)Committee Member, present
JC
Councillor Jane Chitty (Con)Committee Member, present
HD
Councillor Howard Doe (Con)Committee Member, apologies
PF
Councillor Phil Filmer (Con)Committee Member, present
PH
Councillor Peter Hicks (Con)Committee Member, present
MO
Councillor Mike O'Brien (Con)Committee Member, present
KT
Councillor Kelly Tolhurst (Con)Committee Member, present
AB
Dr Alison BarnettOfficer, in attendance
RC
Robin CooperOfficer, in attendance
ND
Neil DaviesOfficer, in attendance

All 17 on the meeting page

More from Medway Cabinet

All decisions
MeetingDecisionOutcome
22 Sep 2026 Articles on the Highway Policy132/2026 The Cabinet approved the final , set out at Appendix 3 to the report, for implementation and noted that futu... Approved Open
22 Sep 2026 Continuation of the Grow in Kent Visitor Economy and Inward Investment Service136/2026 The Cabinet approved the continuation of Medway Council participation in the Grow in Kent service. 137/2026 ... Approved Open
22 Sep 2026 Medium Term Financial Outlook 2026-2031The Cabinet noted the projected budget requirement, the Council’s resource assumptions, and the resultant projected b... Noted Open
22 Sep 2026 Private Sector Licensing (Additional & Selective Licensing Schemes)The Cabinet noted the outcome of the consultation process detailed in the Consultation Report (June 2026), which prov... Noted Open
22 Sep 2026 Procurement Strategy 2025-2030 Update ReportThe Cabinet noted the comments of the Business Support and Digital Overview and Scrutiny Committee, as set out in sec... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies