Resolved
That in accordance with the Officer recommendation planning permission be granted subject to the conditions set out in appendix 1 to the report with an added condition about battery management
Southern Planning Committee decided this item on Tuesday 14 March 2023. Below is the council's own wording, with the papers it was decided on.
Resolved
That in accordance with the Officer recommendation planning permission be granted subject to the conditions set out in appendix 1 to the report with an added condition about battery management
AGENDA ITEM
Committee and date
Southern Planning Committee
14th March 2023
Development Management Report
Responsible Officer: Tracy Darke, Assistant Director of Economy & Place
Summary of Application
Application Number: 22/01816/FUL Parish: Albrighton
Proposal: Erection of a solar generating facility (solar farm) with a capacity of up to 16 Megawatts, comprising of ground mounted solar photovoltaic (PV) panels, a battery storage facility, erection of a 2.5m high security fence up to 2.5m high, erection of up to no.19 CCTV Poles with a maximum height from ground level of 3m and associated infrastructure
Site Address: Land to the West of County Lane Albrighton Shropshire
Applicant: Boultbee Brooks (Renewables County Lane) Ltd
Case Officer: Rachael Evans email: [email protected]
Grid Ref: 383317 - 304005 AGENDA ITEM
Southern Planning Committee - 14th March 2023 Land To The West Of
© Crown Copy right. All rights reserv ed. Shropshire Council 100049049. 2022 For ref erence purposes only . No f urther copies may be made.
Recommendation: - Grant Permission subject to the conditions set out in Appendix 1.
REPORT
1.0THE PROPOSAL
1.1This application is for a solar generating facility (solar farm) with a capacity of up to 16 Megawatts, comprising ground mounted solar photovoltaic (PV) panels, a battery storage facility, erection of security fence of up to 2.5m high, erection of up to no.19 CCTV Poles with a maximum height from ground level of 3m and associated infrastructure including: Underground cabling Client switchroom Storage containers Distributer Network Operation (DNO) substation Transformer Inverter stations CCTV cameras AGENDA ITEM
Southern Planning Committee - 14th March 2023 Land To The West Of
Construction compound Landscape and Biodiversity enhancement areas
Fully built out and operational, the solar farm would meet the energy needs of 1.2 approximately 5300 homes in the district. Owing to the amount of energy produced, the development would result in a reduction of approximately 3600 tonnes of CO2.Construction works are anticipated to take around 6 months. The site would have an operational life of up to 40 years, after which, the solar farm would be decommissioned, and the Land reinstated. The DNO substation would be retained on site in perpetuity.
The solar farm would consist of ground mounted solar panels fixed to an aluminium 1.3 substructure which would be driven into the ground between 0.8m and 2m in depth. The solar panels would have a maximum height of 2.65m from the adjacent ground level. The aluminium racks which the panels would be mounted on would be laid out in multiple rows running north – south across various field enclosures. The distance between the mounted panels will be dictated by the topography of the land however, a typical distance would be 4.5m between each of the arrays. The panels would be orientated to face the south on a 25-degree angle.
Under Ground Cabling – Underground cabling would be placed around the site 1.4 connecting the development to the electricity substation to the north-west of the site. The cable trench would be between 0.5m – 1.1m in depth and approximately 0.5m wide. The insulated DC cables from the solar panels (or modules as they are known) would be routed in channels fixed on the underside of the aluminium framework. The trench may also carry earthing and communication cables. The trenches would be backfilled with sand and excavated material to the original ground level.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Land to the West of County Lane Albrighton Shropshire (22/01816/FUL)Report | 935 KB | DownloadRead as text |
Follow Southern Planning Committee at Shropshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 May 2026 | MinutesThat the of the meetings of the Southern Planning Committee held on Tuesday 24 February 2026 and 14 May 2026 be appro... | Approved | Open |
| 26 May 2026 | Proposed Residential Development Land East of Ford Shrewsbury Shropshire (25/04301/FUL)RESOLVED That contrary to officer recommendation planning permission be refused for the following reasons: · The appl... | Refused | Open |
| 26 May 2026 | Swancote Energy Ltd Anaerobic Digestion Plant at Swancote Farm, Swancote, Bridgnorth (25/02645/VAR)RESOLVED That in accordance with Officer recommendation planning permission be granted subject to the conditions set ... | Decided | Open |
| 26 May 2026 | Proposed Residential Development Land Off Benthall Lane And Bridge Bank Benthall Broseley Shropshire (25/03946/OUT)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... | Decided | Open |
| 26 May 2026 | Proposed Residential Development Land East Of Shaw Lane Albrighton Shropshire (25/03227/REM)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.