That against the Officer recommendation planning permission be refused for the following reasons: The proposals would have an adverse effect on the openness of the greenbelt and that there were no very special circumstances to allow development on the green belt, the development is contrary to the reasons for including land within the green belt as it will leads to urbanisation and urban sprawl contrary to policy CS5 of the Core Strategy Loss of a viable farming business on best and most valuable agricultural land, having adverse effect on the local economy contrary to policy CS13 of the Core Strategy Harm to the character of the landscape not outweighed by the benefits, fails to conserve or enhance natural assets
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Responsible Officer: Tracy Darke, Assistant Director of Economy & Place
Summary of Application
Application Number: 22/02441/FUL Parish: Kemberton PC Proposal: Installation of solar farm and associated infrastructure Site Address: Proposed Solar Farm to the south of Hall Lane, Kemberton, Shifnal Applicant: Vattenfall Case Officer: Grahame French email: [email protected]
Recommendation:- Approve subject to the conditions set out in Appendix 1
Fig 1 location REPORT
1.0THE PROPOSAL
1.1The application is for a solar generating facility with a capacity of 22 megawatts. The solar farm would consist of photovoltaic (PV) panels fixed to metal mounting substructures to form solar arrays. The height of the arrays would be c.2.7m. Associated ancillary infrastructure and works will also be required as part of the
Page 1 of 47 development (i.e., Inverter Stations, Customer Substation, DNO Substation, CCTV with poles of up to 3m, perimeter fencing and gates up to 2m, internal access roads).
1.2The solar arrays would be laid out in multiple parallel rows running east-west across the site. The distance between the arrays will typically be 3 metres. Land between and beneath the panels would be used for biodiversity enhancements and seasonal sheep grazing. DC cables from the solar panels would be fixed on the underside of the arrays and would run along the entire underside of each row, linking to the Inverter Stations and then to the on-site customer and distribution network operator (DNO) substations.
1.3The solar farm would be contained within agricultural stock-proof wire deer fencing up to 2m in height. Internal access tracks will be provided across the site to allow access to equipment for maintenance purposes. The tracks would have a width of 4m and be constructed with crushed aggregate. The proposed site access for all phases of the development is planned to be taken from a new access point located on the B4379 to the west of the site.
1.4The applicant states that the site would generate enough electricity to power approximately 6000 homes annually giving a CO2 saving of approximately 5,280 tonnes per annum. The proposals would deliver biodiversity net gain (BNG) of 24.46% in primary habitat and 7.4% in linear habitats.
1.5Construction would take 6 months. The site would have an operational life of up to 40 years, after which it would be decommissioned, and the agricultural land would be reinstated.
Fig 2 – Site layout
Page 2 of 47 Fig 3 – Panel sections
1.6Construction and operation - It is proposed that impacts during the construction phase are controlled via a Construction Method Statement and Construction Environmental Management Plan. Once installed, the facility would be unmanned, being remotely operated and monitored. Operational access would only require about one trip by a small van or pick-up truck a month for maintenance and cleaning. At the end of the 40-year operational lifespan of the solar farm, the site would be restored back to full agricultural use with all equipment and below ground connections removed. The landscape enhancement measures would remain.
1.7Amendments - In response to representations made to the Planning Application, a number of amendments have been made to the original submitted plans. The DNO containerised electricity sub-station is proposed to be lower in height than first indicated (will not now exceed 3.5m) and is proposed to be screened by additional (and ‘gapped up’) hedgerow planting. To further reduce impacts, all previously proposed inverter buildings are also no longer proposed.
1.7Community benefits: Whilst not forming an integral part of the current application the applicant has also committed to provide a community benefit fund for use by the local community.
2.0SITE LOCATION / DESCRIPTION
2.1The Application Site extends to 19.9 hectares (ha) of agricultural land and is made up of two adjacent pasture fields.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.