AI summaryCabinet noted the Ledbury structural survey, which found four tower blocks need strengthening, and required a consultation outcome report plus a separate timescale update for 23 January 2018. Costs are currently met from HRA and HIP contingency sums. [D][P35][P49] [P65]
MoneyHRA and HIP contingency [P65]All associated costs currently met from contingency sums [P65]
What happens nextConsultation report [D]Update including timescales on 23 January 2018 [D]
Who it affectsLedbury Estate blocks [P6]Strengthening and resident consultation required [P35][P49][P55]
What was decided
Cabinet noted the Arup structural assessment and the draft key stages being worked through with the Ledbury Resident Project Team. [D][P1] Report P1
A further report will set out the outcome of resident consultation on the options appraisal. [D][P1] Report P1
The 23 January 2018 cabinet meeting will receive a separate update report, including timescales. [D]
Why
Arup found that the buildings did not meet BRE guidance for accidental damage in buildings without piped gas, so they need strengthening. [P35][P49] Report P35, P49
The blocks were at risk of disproportionate collapse from a piped gas explosion. Disconnecting the gas on 11 August 2017 reduced the risk without removing it. [P28][P30] Report P28, P30
Section 105 requires consultation while proposals are still formative. The council must give enough reasons and time for responses and take the consultation outcome into account before the final decision. [P60][P61] Report P60, P61
What happens next
A further report will set out the outcome of resident consultation on the options appraisal. [D][P1] Report P1
The 23 January 2018 cabinet meeting will receive an update report, including timescales. [D]
The Resident Project Team will consider the works scope, resident engagement, the independent consultant appointment, and whether to use current council consultants or a separate cost consultant. [P55] Report P55
The money
£53,700 Receipts for remedial works Report P25
Implications
Risk: Floor units beside flank and external walls, upper level cross walls, specified party walls, and panel connections need strengthening across all four blocks. [P37][P38] Report P37, P38
Legal: Section 105 requires consultation at a formative stage, with sufficient reasons and time, and the outcome must be considered before the final decision. [P60][P61] Report P60, P61
Risk: Piped gas was disconnected on 11 August 2017, reducing the main explosion risk, but bottled gas and oxygen cylinders remain banned until strengthening is in place. [P28][P40][P50] Report P28, P40, P50
Risk: Wind resistance is adequate, but wall panel joints need inspection and repair if necessary for long term resistance. [P43][P45] Report P43, P45
Other: Tests found the concrete and embedded steel reinforcement in good condition. [P47] Report P47
Other: Strengthening may require removing and reinstating plaster and floor finishes, floor screeds, heating pipes, radiators, baths and kitchens. [P36] Report P36
Equalities: The public sector Equality Duty applies during consultation and when members consider the final decision. [P62] Report P62
Financial: All associated costs are currently met from contingency sums within the Housing Revenue Account and the Housing Investment Programme. [P65] Report P65
Who and where
Occupants of Bromyard House, Peterchurch House, Sarnsfield House and Skenfrith House Report P6, P35
Ledbury Estate residents and former residents Report P52, P53, P54
Secure tenants likely to be substantially affected as a whole or as a group Report P60
Residents bringing bottled gas or oxygen cylinders into the blocks Report P40, P41
Timeline
July 2017: Arup was asked to investigate resident reports of cracking. Report P19
11 August 2017: Piped gas was disconnected at all four towers. Report P28
October 2017: The Resident Project Team was set up and began meeting monthly. Report P55
October 2017: Arup carried out intrusive investigations in 19 void flats across all four blocks. Report P32
20 November 2017: The Arup structural assessment was dated. Report P4, P68
Thursday 23 November 2017: Arup presented its findings at a public meeting attended by 70 residents. Report P53
5 December 2017: The Resident Project Team was due to consider the draft key stages, works scope, engagement and consultant arrangements. Report P55
23 January 2018: Cabinet was to receive an update report including timescales.
Plain English for the jargon
Disproportionate collapse: A gas explosion causing much more damage than expected and the collapse of a building corner. [P14]
BRE: Building Research Establishment. [P16]
HRA: Housing Revenue Account. [P65]
HIP: Housing Investment Programme. [P65]
Flank walls: End walls that support the floor panels. [P11][P12]
Cross walls: Internal walls that help support the floor slab panels. [P12]
Void flats: Unoccupied flats used for intrusive investigations. [P27][P32]
Options appraisal: A process intended to inform subsequent decisions about the estate. [P65]
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item17
Resolved
That the content of the report and the draft key stages that officers are working through with the Ledbury Resident Project Team be noted and that a further report setting out the outcome of the resident consultation on the options appraisal process be received by cabinet. 2. That an update report (including timescales) be received at 23 January 2018 cabinet.
Word for word from the decision Southwark published for this meeting.Source: moderngov.southwark.gov.uk
Report to Cabinet (decommissioned, for the Executive after, 8 pages
Recommendation
1. That cabinet notes the content of this report; the draft key stages that officers are working through with the Ledbury Resident Project Team; and receives a further report setting out the outcome of the resident consultation on the options appraisal process.
BACKGROUND INFORMATION
2. Arup was appointed by Southwark Council to carry out a structural engineering assessment of the four 14-storey high tower blocks on the Ledbury Estate in Peckham.
3. This report provides a summary of the Arup report called “Ledbury Estate: Structural Assessment of Bromyard, Peterchurch, Sarnsfield and Skenfrith House” dated 20 November 2017.
Description of the buildings
4. There are four tower blocks on the Ledbury Estate: Bromyard House, Peterchurch House, Sarnsfield House and Skenfrith House.
5. All of the blocks are 14 storeys high and ‘H-shaped’. In every block there are four flats per floor; two flats on both sides of the stairwell and lifts in the middle.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Cabinet (decommissioned, for the Executive after at Southwark and we tell you when its next papers are published, before the meeting rather than after it.
Review of Void Disposal StrategyThat the progress of disposals of void housing properties since April 2009 be noted. 2. That the importance of void d...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.