Resolved
that the contents of the report be noted.
South London Waste Partnership Joint Committee noted this item on Tuesday 5 December 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
that the contents of the report be noted.
This report provides Joint Waste Committee with an update on the performance of the three Phase A Contracts applicable to the South London Waste Partnership:
i. Contract 1 - Transport and Residual Waste management ii. Contract 2 - HRRC services - HRRC site management and material recycling iii. Contract 3 - Marketing of recyclates and treatment of green and food waste
This report provides performance data for the quarter one period 1 April 2017 until 31 September 2017.
This report also provides Joint Waste Committee with an update on the Phase B Contract.
Joint Waste Committee is asked to note the contents of this report, and comment on any aspects of the performance of the Partnership’s Phase A & B contracts.
Background Documents:
Contract Performance Monitoring updates have been presented to the Joint Waste Committee since 22 July 2010. The most recent reports were presented at the meeting in September 2017 by the Contract Manager. Agenda Item 5 Page 8
1. PHASE A BACKGROUND
1.1Contract 1 is operated by Viridor Waste Management Ltd and includes the bulk haulage of material and the disposal of residual waste.
1.2Contract 2, the HRRC service is operated by Veolia (ES) (UK) Ltd. The contract commenced on the 1 October 2015 and includes the management of the 6 Partnership HRRC sites in addition to the marketing of recyclates collected at each of the sites.
1.3Contract 3 is operated by Viridor and includes the marketing of recyclates and the treatment of green and food waste.
1.4The London Boroughs of Croydon, Sutton and Merton direct deliver kerbside collected residual waste and organics into the Beddington site, operated by Viridor. Merton also deliver kerbside recycling to Beddington, whilst Sutton delivers kerbside recycling to both Beddington and Veolia under a separate contract, and Croydon deliver all recycling to Veolia.
1.5The Royal Borough of Kingston (RBK) direct delivers kerbside collected waste, organics, and recyclates into the Kingston Villiers Road Waste Transfer Station (WTS). Viridor operate Villiers WTS and related bulk haulage services on behalf of RBK under Contract 1.
2. PERFORMANCE DETAIL
2.1Contract 1: Transport and Residual Waste Management (Viridor Waste Management Limited)
2.1.1. Under Contract 1 for the period being reported, 1 April 2017 until 31 September 2017, the Partnership managed just over 112,000 tonnes of residual waste. This shows a drop in waste of 8.5% (10,475 tonnes) when the data is compared to the same period last year. This is largely as a result of changes introduced through the new environmental services contract. Please see Appendix A table 1a for further detail.
2.1.2. Landfill Diversion: Viridor has diverted just under 25,000 tonnes of residual waste from landfill via the Lakeside ERF during the period being reported. This equates to a 22% diversion from landfill for the Partnership. Viridor have direction on which borough’s waste is diverted to Lakeside, largely determined by the location and capacity at the facility receiving the waste. Please see Appendix A table 2b for further tonnage data.
2.1.3. The Contract is operating effectively. There were no major operational or performance issues, no formal complaints were reported, and there were no KPI failures reported under Contract 1. Page 9 Agenda Item 5
2.2Contract 2: Management of the Household Reuse and Recycling Centres (Veolia (ES) (UK) Ltd)
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
(5) Phase A & B Contract Management ReportReport | 468 KB | DownloadRead as text |
PDF |
(5) Phase A & B Contract Management Report: Appendix AAppendix | 80 KB | Download |
Follow South London Waste Partnership Joint Committee at Sutton and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Nov 2025 | Minutes of the previous meetingThat the minutes of the previous meeting held on 11 June 2025 were approved as a correct record. | Approved | Open |
| 26 Nov 2025 | Communications and Engagement UpdateTo Note the contents of this report and comment on any aspects of communications and engagement activities relating t... | Noted | Open |
| 26 Nov 2025 | Contracts Performance ReportNote the latest position with the ERF residual waste treatment contract related to the recent CEMS calibration issue ... | Noted | Open |
| 26 Nov 2025 | Budget Update 2025/26To note the content of this report. | Noted | Open |
| 26 Nov 2025 | Proposed Management Budget 2026/27To approve the 2026/27 SLWP Budget of £707k. This represents an annual cost of £177k per borough and an increase of j... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.