CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Sutton
South London Waste Partnership Joint Committee, Wednesday 8 September 2021 at 7.00pm

Phase A and B Contract Management Report

Noted Committee 2 papers

South London Waste Partnership Joint Committee noted this item on Wednesday 8 September 2021. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

The content of the report be noted. Provided comment on any aspects of the performance of the Partnership’s Phase A and B contracts.
Word for word from the decision Sutton published for this meeting. Source: moderngov.sutton.gov.uk

Follow this further

Built from Sutton's papers

What the report saysPro

Report to South London Waste Partnership Joint Committee

Summary

This report provides Joint Waste Committee with an update on the performance of the Phase A and Phase B Contracts procured and managed by the South London Waste Partnership:

i. Contract 1: Receipt and Transport of Food, Green and mixed recycling. ii. Contract 2: HRRC services - HRRC site management and material recycling iii. Contract 3: Treatment of food and green iv. Phase B: The 2012 Residual Waste Treatment Contract (the ERF Contract)

This report provides performance data for the period 1 April 2021 to 30 June 2021.

Recommendations

1. To note the report. 2. To comment on any aspects of the performance of the Partnership’s Phase A and B contracts.

Background Documents

Contract Performance Monitoring updates have been presented to the Joint Waste Committee since 22 July 2010. The most recent reports were presented at the meeting in June 2021 by the Interim Strategic Manager, Andrea Keys. Agenda Item 5 Page 12 BACKGROUND

1.1Phase A: Contract 1 is operated by Viridor Waste Management Ltd and includes the receipt, bulking and haulage of green, food and recycling until 31 August 2022. (The disposal element of this contract ceased on 3 March 2019 and since 4 March 2019 the residual waste has been managed through the Residual Waste Treatment Contract operated by Viridor South London Ltd (also referred to as the Phase B ERF Contract)).

1.2The London Boroughs of Croydon, Sutton and Merton directly deliver kerbside-collected garden and food waste into the Beddington site, operated by Viridor.

1.3The Royal Borough of Kingston (RBK) directly delivers kerbside-collected residual, recyclates, garden waste and food waste into the Kingston Villiers Road Waste Transfer Station (WTS). The WTS is divided into three parts and is operated by Viridor South London under the Residual waste treatment contract (see 1.6 below), by Veolia under the HRRC contract (1.4), and also by Viridor WML under this Contract 1.

1.4Phase A: Contract 2, the HRRC service is operated by Veolia (ES) (UK) Ltd. The contract commenced on 1 October 2015 and includes the management of the 6 Partnership HRRC sites in addition to the marketing of recyclates collected at each of the sites.

1.5Phase A: Contract 3 is operated by Viridor Waste Management Ltd and includes the composting of garden and food waste until August 2022. The services provided under Contract 1 receive and bulk this material and then provide onward transport to the composting facilities in this Contract 3.

1.6Phase B: Residual Waste Treatment Contract - Viridor South London Limited (‘Viridor SL’) was formally awarded a contract for the treatment and disposal of residual waste in November 2012. The Contract involves Viridor designing, building and operating an Energy Recovery Facility (ERF) which will remain in its ownership and through which it will dispose of suitable and permitted municipal residual waste arising in the South London Waste Partnership area.

PERFORMANCE DETAIL

1.7Contract 1: Waste transfer station bulking and haulage (Viridor Waste Management Limited)

1.8Contract 1 includes waste transfer station operations and bulk haulage services only. The Contract is operating effectively and there are no issues to report.

2. Contract 2: Management of the Household Reuse and Recycling Centres (Veolia (ES) (UK) Ltd) Page 13 Agenda Item 5 2.1. HRRC Contract Performance Review: The scope of the HRRC services can be summarised in three parts: the general management of the sites including staffing, plant, equipment, and site layouts; the transportation of materials; and the recycling, treatment, and/or disposal of waste collected at the HRRC sites (excluding garden and residual waste).

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
1a PART A: Contract Management Report A and B Q1 September 21: Final.docxReport 100 KB DownloadRead as text
PDF
1b JWC Quarterly Dashboard Q1 2021-22Report 49 KB Download

At this meeting

Whole meeting

Who was there

8 of 10 attended
MA
Councillor Manuel AbellanChair, present
BA
Councillor Ben AndrewVice-Chair, present
PC
Councillor Patsy CummingsCommittee Member, present
MA
Councillor Muhammad AliCommittee Member, present
TC
Councillor Tim CobbettCommittee Member, apologies
JS
Councillor John SweeneyCommittee Member, present
TB
Councillor Tobin ByersCommittee Member, present
NI
Councillor Natasha IronsCommittee Member, apologies
MW
Councillor Martin WheltonSubstitute, present as substitute
DR
Councillor Dave Ryder-MillsSubstitute, present as substitute

On this subject at Sutton

Search all
  1. Phase A and B Contract Management ReportThis decision
  2. Communications and stakeholder engagement – Phase A and Phase B contractsNoted
  3. Phase A & B Contract Management ReportNoted
  4. Phase A & B Contract Management ReportNoted
  5. Phase A Contract Management Reporting - Quarter 3Noted
  6. Phase A Contract Management ReportingNoted

More from Sutton South London Waste Partnership Joint Committee

All decisions
MeetingDecisionOutcome
26 Nov 2025 Minutes of the previous meetingThat the minutes of the previous meeting held on 11 June 2025 were approved as a correct record. Approved Open
26 Nov 2025 Communications and Engagement UpdateTo Note the contents of this report and comment on any aspects of communications and engagement activities relating t... Noted Open
26 Nov 2025 Contracts Performance ReportNote the latest position with the ERF residual waste treatment contract related to the recent CEMS calibration issue ... Noted Open
26 Nov 2025 Budget Update 2025/26To note the content of this report. Noted Open
26 Nov 2025 Proposed Management Budget 2026/27To approve the 2026/27 SLWP Budget of £707k. This represents an annual cost of £177k per borough and an increase of j... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies