Decision Notice D180034MEM The report of the Director of Street Scene, Leisure and Technical Services provided an update on progress with a number of key projects contained in the Borough Council’s Capital Plan. Particular reference was made to the increase of parking provision at Leybourne Lakes and Haysden Country Parks, the ventilation and boiler replacement at Larkfield Leisure Centre, the replacement of the sewage system at Haysden Country Park, path works at Tonbridge Cemetery, the refurbishment of the Tonbridge to Penshurst Cycle Route to the rear of Tonbridge Racecourse Sportsground and the installation of an active drainage system to improve the Rugby Pitch Drainage at Tonbridge Racecourse Sportsground. It was noted that a major part of the schemes would be funded through developer contributions, partnership arrangements and external sources. RECOMMENDED: That the updates on the current Capital Plan, as set out in Annex 1 to the report, be noted.
Word for word from the decision Tonbridge and Malling published for this meeting.Source: democracy.tmbc.gov.uk
Report of the Director of Street Scene, Leisure & Technical Services Part 1- Public
Matters for Recommendation to Cabinet - Non-Key Decision (Decision may be taken by the Cabinet Member)
1 CAPITAL PLAN PROJECTS
Summary This report advises Members of progress with key projects contained in the Council’s Capital Plan.
1.1Introduction
1.1.1 It is important that progress on the Council’s Capital Plan programme is kept under regular review and a number of key List A projects have been updated below. In addition, a full update reflecting the current List A schemes relevant to this Board is attached at [Annex 1] for information.
1.1.2 Schemes within the Capital Plan were considered and approved by Members of the Finance, Innovation and Property Advisory Board on the 3 January 2018. Schemes were brought forward and evaluated taking into consideration the Council’s current financial position and the following established criteria:
To meet legislative requirements including health and safety obligations
Funded from external resources
Reduce revenue expenditure and/or generate income
1.1.3 The Council has an annual Capital Plan budget of £200,000 and Members will note that the approved schemes below exceed this allocation. Many will be dependent on external funding, in particular developer contributions.
1.2Leybourne Lakes Country Park – Additional Car Parking
1.2.1 Currently on List A, the project aimed to increase parking provision within the main car park by increasing the number of bays (approximately 30) within the current overflow car park.
1.2.2 The total project cost was estimated at £17,000 with £9,700 being funded from receipts from South East Water, secured in relation to a recent Easement
Communities&HousingAB-NKD-Part 1 Public 29 May 2018 2
Agreement connected to the Park. I am pleased to advise that the project was completed in December 2017 within budget and the new spaces are now available and being used by visitors to the Park.
1.3Haysden Country Park – Additional Car Parking
1.3.1 It had previously become apparent that at peak times the current main car park cannot accommodate visitor demand, with cars parking along the main driveway or not being able to park at all. In response to this, temporary measures were put in place last summer and included the removal of the raised beds in the car park and clearance to the end of the existing overflow car park to create approximately 10 additional spaces. Additional temporary parking was also created within Tile Barn Field that lies beyond the end of the existing overflow cark park. This has created approximately 70 additional temporary parking spaces.
1.3.2 Parking was monitored over the summer period as it is now the intention that the temporary parking arrangements within Tile Barn Field be formalised. A budget allocation of £30,000 was approved within the Capital Plan and I am pleased to advise that the full cost of the scheme is being met through developer contributions.
1.3.3 Works have already commenced on site and it is envisaged that these will be complete prior to the meeting of the Board. The additional parking bays will be fully available to visitors over the forthcoming summer months.
1.4Larkfield Leisure Centre – Ventilation and Boiler Replacement
1.4.1 The existing ventilation system and main building boiler were installed in 1991 and 1981 respectively. A number of operational issues have been brought to the Council’s attention relating to their poor performance including poor environmental conditions, excess heat, undesirable smells and condensation leading to slips, trips and falls.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Communities and Housing Advisory Board at Tonbridge and Malling and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.