RESOLVED – That consideration of the application be DEFERRED to allow for further discussions with the applicants regarding an alternative access road from Holyhead Road and a financial contribution towards independent monitoring of dust and air quality within the local community area. Also add following condition to committee report in the event of an appeal against non-determination Add Condition 6 The existing gas turbines which are identified to be de-commissioned within the submitted planning statement forming part of this application shall be dismantled and removed from the site prior to the first use of the development hereby approved. Reason To ensure that the total electricity generating capacity at the site does not exceed the threshold for a Development of National Significance
Word for word from the decision Wrexham published for this meeting.Source: moderngov.wrexham.gov.uk
REPORT OF THE CHIEF OFFICER PLANNING AND REGULATORY Date – 6 January 2020
APPLICATION NO: LOCATION: DATE RECEIVED: P/2019 /0505 KRONOSPAN LTD HOLYHEAD 08/07/2019 ROAD CHIRK WREXHAM LL14 5NT COMMUNITY: CASE OFFICER: Chirk DESCRIPTION: KH DEVELOPMENT OF A BUILDING CONTAINING 2 NO. GAS ENGINES WARD: EACH WITH A MAXIMUM AGENT NAME: Chirk South ELECTRICITY GENERATING AXIS CAPACITY OF 9.73 MW, 2 NO. MR ANDREW RUSSELL STEAM BOILERS, ROOF MOUNTED COOLERS, WALKWAY BETWEEN AN ADJACENT BUILDING AND THE PROPOSED BUILDING, EXHAUST GAS OFFTAKE PIPES AND STEAM PIPES FROM THE GAS ENGINE BUILDING AND CARBON CATALYST ABATEMENT SYSTEM
APPLICANT(S) NAME: MR KEITH BAKER KRONOSPAN LTD
______________________________________________________________ P/2019/0505 THE SITE
The location of the proposed development lies within the existing Kronospan manufacturing site. The Kronospan site is an established industrial area located on land adjacent to Holyhead Road (B5070) Chirk and covers a total of approximately 40 hectares REPORT OF THE CHIEF OFFICER PLANNING AND REGULATORY Date – 6 January 2020
PROPOSAL
The proposed development comprises of the installation and operation of 2 No. gas engines each with a maximum electricity capacity of 9.73 MW. Other ancillary works involve the removal of existing equipment, a control room, installation of roof mounted coolers and the installation of carbon monoxide catalyst abatement system. REPORT OF THE CHIEF OFFICER PLANNING AND REGULATORY Date – 6 January 2020
The application includes a Landscape and Visual Assessment, a Noise Report, an Air Quality Report, and a Planning Statement. A screening opinion has also been undertaken (EIA Regulations) which concludes that the proposed development is unlikely to give rise to significant environmental effects. It does not constitute EIA development.
HISTORY (Most Recent)
P/2017/0700 Development of a Raw Board Store. Refused 06.11.2017. Allowed on Appeal 22.05.2018 P/2017/0416 Replacement of existing wood chip preparation facility to include a building to house new wood chip preparation equipment, development of a new wood chip dryer and assorted sifting, grading and transfer system and demolition of existing structures to facilitate the development. Granted 31.07.2017. P/2016/0534 Proposed extension to store medium density fibreboard. Refused 05.09.2016. P/2016/0442 MDF wash water pre-heater. Granted 23.01.2017. P/2016/0336 Extension to house a new melamine facing (MF) press, following the demolition / re-location of the existing MF departments ventilation system, hydraulic oil and diesel storage tanks, a vehicle filling station, garage service building and other associated infrastructure. Allowed on Appeal 04.05.2017. P/2018/0551 Development of an Orientated Strand Board (OSB) production facility. Allowed on Appeal 09.10.2019
DEVELOPMENT PLAN
Within the settlement for Chirk. Policies PS1, PS2, GDP1, EC5 and EC7 of the Wrexham UDP apply.
CONSULTATIONS
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.