ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25

Noted Committee 1 paper

Bute and Cowal Area Committee noted this item on Tuesday 5 March 2024. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

Decision The Bute and Cowal Area Committee: 1. provided comments on the draft programme contained at appendix 1 of the report, which were noted by the Head of Roads and Infrastructure Services; and 2. noted that the programme would go forward to the Environment, Development and Infrastructure Committee on 21 March 2024 for endorsement. (Reference: Report by Executive Director with responsibility for Roads and Infrastructure Services, dated February 2024, submitted)
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Bute and Cowal Area Committee

Executive summary

1.1Attached to this report is a draft programme for roads reconstruction schemes for 2024/25 in the Bute and Cowal area. This programme has been designed using the current Road Condition Index (RCI) which is produced by the national road condition survey data. In addition to the RCI data, information such as road traffic collisions, known development, activities such as timber harvesting and skid condition (of the carriageways surface) which is measured by a separate survey are also considered together with information brought forward from Elected Members during agreed Area Business Days with officers from Roads and Infrastructure Service. This information is considered at officer level when appropriate engineering judgement is also applied to ensure that maximum benefit can be derived from the available investment.

1.2The Roads Reconstruction Programme has been structured in line with the Roads Asset Management and Maintenance Strategy. The focus has been to arrest the rate of decline and provide an overall improvement in condition as has been demonstrated in the Annual Status and Options Report. In previous years this has been achieved through the delivery of a mix of carriageway resurfacing, edge strengthening, patching/surface dressing and in-situ road surface recycling. These treatments have been designed to seal the road to stop the ingress of water, improve ride quality and reduce the number of reactive repairs. This has resulted in an overall improvement in road conditions. Without this investment and works there would have been a significant deterioration in condition and a detriment to the travelling public, economic opportunity and tourism.

1.3Following the Council’s Budget Meeting, which took place on 22 nd February 2024, £8M has been confirmed for the Capital Roads Reconstruction budget.

1.4As per previous years any post winter deterioration may result in some adjustment to the programme to ensure that the best rates of return in terms of whole life costs can be achieved. 2.0 RECOMMENDATION

2.1It is recommended that the Bute and Cowal Area Committee:

• Provide comments on the draft programme that is contained in Appendix 1 of this report. • Note that the programme will go forward to the Environment, Development and Infrastructure Committee on 21 March 2024 for endorsement.

3.0DETAIL

3.1The focus of the roads reconstruction programme has been to recover the network through the delivery of a mix of carriageway resurfacing schemes, patching/surface dressing and in-situ road surface recycling, which follow the principles set out within the Roads Asset Management Plan.

3.2This Council has approximately £122M of backlog maintenance (based on figures produced by SCOTS) across the road network. This means that over £122M would need to be invested to bring the road network up to an ‘A1’ standard. Most councils are in a very similar position. During these challenging financial times, it is very unlikely we will benefit from the level of investment required to bring the road network up to an ‘A1’ condition.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25Report 255 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 11 attended
GB
Councillor Gordon BlairMember, apologies
AF
Councillor Audrey ForrestMember, present
DH
Councillor Daniel HampseyMember, apologies
RK
Councillor Reeni Kennedy-BoyleMember, present
LM
Councillor Liz McCabeChair, present
YM
Councillor Yvonne McNeillyVice-Chair, apologies
RM
Councillor Ross MorelandMember, present
JS
Julieann SmallSecretary, expected
AP
Adele Price-WilliamsSecretary, expected
WS
Councillor William SinclairMember, present
PW
Councillor Peter WallaceMember, present

On this subject at Argyll and Bute

Search all
  1. ROADS CAPITAL RECONSTRUCTION PROGRAMME 2024/25This decision
  2. Roads capital reconstruction programme 2026-27 - update reportAgreed
  3. Roads capital reconstruction programme 2026-27Agreed
  4. Roads capital reconstruction programme - 2025/26Agreed
  5. Roads capital reconstruction programme 2024/25 - update reportAgreed
  6. Roads capital reconstruction programme 2024/25Agreed

More from Argyll and Bute Bute and Cowal Area Committee

All decisions
MeetingDecisionOutcome
1 Sep 2026 Charts (argyll and the isles)Decision The Bute and Cowal Area Committee considered and noted the information provided in the presentation. (Refere... Noted Open
1 Sep 2026 Area committee quarterly performance reports fq1 2026/27Decision The Bute and Cowal Area Committee noted the performance and supporting commentary as presented. (Reference: ... Noted Open
1 Sep 2026 Supporting Communities Fund 2026/27Decision The Bute and Cowal Area Committee agreed that the 20 applications, marked as ‘Award’ or ‘Partial Award’ with... Agreed Open
1 Sep 2026 Roads and infrastructure services updateDecision The Bute and Cowal Area Committee noted the contents of the report. (Reference: Report by Executive Director... Noted Open
1 Sep 2026 Cruach mhor and clachan flats windfarm trustsDecision The Bute and Cowal Area Committee noted these updates, which are the most recent of the annual updates requi... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies