Cabinet: 1. Approved the resurfacing schemes in Appendices 1 & 2 and delegate authority to the Cabinet Member for Environment, Climate Change and Operations to approve any changes in the ranking of resurfacing schemes required by any fluctuations in construction prices and network deterioration that are recommended by officers; 2. Approved the proposed works on structures detailed in the report; 3. Approved the programme of works associated with the Integrated Transport Block funding in Appendix 4; and 4. Delegated authority to the Cabinet Member for Environment, Climate change and Operations to approve the programme of preventative maintenance works.
Word for word from the decision Bury published for this meeting.Source: councildecisions.bury.gov.uk
Set out proposed priorities for Highway Investment Strategy tranche 3 (HIS3) and the Highway Maintenance element of the City Regional Sustainable Transport Settlements (CRSTS) funds. A proposed final scheme list for both these funds will be presented in appendices 1 & 2, detailing Strategic and Local road priorities respectively. Set out the priorities of the Integrated Transport Block funding.
2. The highway network is one of the most valuable assets that the Council operates, and is a fundamental connector of people, businesses, and the services that the Council provides. A well-maintained highway network supports our Council priorities as set out in Let’s Do It.
3. As a highway network ages, deterioration increases to the stage where potholes form and require expensive reactive repairs. We have valued the current annual deterioration of our network at approximately £5 million per year.
4. The funding we receive from the Department for Transport (DfT) generally only allows us to prioritise approximately £1.2 million per year for resurfacing schemes. This is not sufficient and will lead to a deteriorating network.
5. Through HIS tranches 1 & 2 an additional £20 million investment in our highway asset has been made available since 2017/18. This additional funding has allowed us to halt deterioration on our classified highways.
6. In previous HIS tranches we have targeted funding to the classified strategic network, however, the condition of our unclassified local roads has unfortunately continued to deteriorate. Therefore, the proposal for the next 4 years is to target the unclassified network with approximately 80% of available funds with the remaining 20% for the classified network.
7. The profile of the HIS3 spending is shown in Figure 1 below. HIS3 Spending Profile (£m)
0.50.9
3.4
5.2
Planned - Strategic Planned - Local Streetscene Road Safety
Figure 1
8. Highway Maintenance CRSTS funds have also been allocated to Bury through GMCA from the DfT. They are an amalgamation of funds received in previous years under the guises of pothole and challenge funding, together with highway maintenance and incentive funding.
9. Highway Maintenance CRSTS is a five year settlement of £12.745 million from 2022/23 to 2026/27. The first year of that funding was included in previously approved proposals as it overlapped with HIS2 and therefore this report will focus on the remaining four years of the CRSTS settlement.
10.HIS3 is the Council’s own borrowed funding and the £10 million funding has been split between highways maintenance, £9.5million and Road Safety £500,000. The highways maintenance allocated will be split over the three year period 2023/24 to 2025/26.
11.The table below summarises the overall amounts concerned with the two funding streams.
12. In line with previous years from 2023/24, 50% of CRSTS and 45% of HIS3 will be allocated to planned highway resurfacing and bridge and structures maintenance. The remaining proportion will be allocated to reactive maintenance, such as pothole repairs, patching, street lighting faults and preventative maintenance, such as surface dressing.
13. The table below summarises the proposed spending profile for planned highway resurfacing and bridge/structures maintenance allocations of the above proportions over the forthcoming period from the 2023/24 financial year.
Year Resurfacing Structures Total (‘000s) (‘000s) (‘000s)
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.