The Cabinet: 1. Approved the updated programme of structures schemes. 2. Delegated authority to the Cabinet Member for Environment, Climate Change and Operations to approve any changes in the ranking required by fluctuations in construction prices and network deterioration that are recommended by officers be extended to include structures to allow flexibility for shifting priorities. Reason for the decision: The Council as the Highway Authority in Bury has a statutory duty to maintain those parts of the public highway, including structures deemed to be publicly maintainable. The condition of the Council’s highway and bridges stock is assessed annually, leading to changing priorities year on year, which needs to be reflected in the on-going programme as some parts of the network and associated structures deteriorate more quickly than others Other options considered and rejected: To continue with the previously approved programme, which would not fund some vital structures works and lead to unacceptable health and safety risks.
Word for word from the decision Bury published for this meeting.Source: councildecisions.bury.gov.uk
24/25 2025/26 2026/27 Total Capital budget 2025/26 - 2026/27 Slippage
Proposed Works/Expenditure
Capital Programme for Highway Details Comments Structures (Est.) DfT CRSTS funding Retention/Misc. Release of retention for previous works £15,000 £15,000 £30,000 carried out and minor miscellaneous items Miscellaneous Structures and feasibility This item covers feasibility and design £225,000 £225,000 £450,000 works associated with bidding and programming future works, together with in year urgent schemes identified by on-going inspections and assessments Subways & LED lighting On going improvements to £25,000 £25,000 £50,000 subways/lighting to replace/converting existing units to more efficient LED units. Protective systems to structures Apply new protective system to steel £50,000 £50,000 elements of structure(s) Eagle & Child Retaining Wall Recent inspections have noted bulging Priority works - Feasibility £250,000 £15,000 £265,000 and other defects to the wall and heavy ongoing, costs are likely to deformation of the footpath to the front be met from 2023/24 of the wall. Investigative works and budget. masonry repairs/refurbishment of the wall is required. Market Street Bridge A principal inspection has found a Feasibility completed, £350,000 £600,000 £50,000 £650,000 number of concrete bearing plinths that design/contract support the bridge have/are failing. A documentation ongoing. scheme of repair is required to replace/make good the failed plinths and associated defects. Walshaw Bank Footbridge Replacement of footbridge inc. new Desing and construction £45,000 £45,000 abutments, rebuilding of training walls 2024/25 and new superstructure. Woodhill Bridge Refurbishment of masonry arch bridge Desing/documentation £50,000 £50,000 inc. repairs/provision of training walls, ongoing. Construction rebuilding of spandrel walls and 2024/25 pressure pointing of arch ring. Replacement of minor Structures Replacement, renovation of smaller £50,000 £50,000 structures. £350,000 £1,160,000 £480,000 £1,640,000 Total DfT Funding
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.