Quarter 3 2024/25 - Housing Health & Wellbeing Housing Compliance Assurance Report

Decided Executive 2 papers

Cabinet decided this item on Tuesday 11 March 2025. Below is the council's own wording, with the papers it was decided on.

Item257

Resolved

That Cabinet note: a) the exceptions to performance of the housing service compliance functions; and b) the new format for performance for Quarter 3 2024.25 onwards. To enable the Cabinet to monitor performance and compliance relating to the Council’s legal and regulatory landlord responsibilities for 27 building safety measures including fire protection, gas, asbestos, electrical and water. Options Considered: Not applicable.
Word for word from the decision Newark and Sherwood published for this meeting. Source: democracy.newark-sherwooddc.gov.uk

Follow this further

Built from Newark and Sherwood's papers

What the report saysPro

Report to Cabinet

Appendix 1. Key Performance Reporting Scorecard for Housing Compliance December_2024 Domestic No.5541 Asset Summary Performance Trend 2024/25 Qtr. Outstanding/ Blocks No. 341 Total Properties Compliance Non- Due within Dwellings Performance Analysis 2 follow-on works Communal No. 4 Compliance 30 days at risk % Performance Gas Safety Commercial Boilers for 4 1 3 3 0 100% 100% Communal Areas only Community Centres 26 26 0 0 0 100% 100%

Domestic Dwellings No. 5209 5137 72 72 0 98.62 98.6%

No. Capped long term 13 13 16

Fire Safety Checks Blocks Requiring FRA and follow 106 0 106 3 106 0% 98.11% Significant WIP on works not competed yet Dwellings within the blocks 929 0 929 3 929 0% 97% Significant WIP not competed yet Fire Alarm Test & Emergency Blocks x 54 54 0 0 0 100% 100% Lighting Weekly Fire Door Communal 117 0 117 0 0 0% 100% By end March will Inspections 3 mthly be completed Fire Door Inspections 6 mthly 100% No longer required. Fire Door Flat Entrance 888 297 591 0 591 33% 10.5% Set up new Inspections Annually programme complete Apr Sprinkler Systems 6 6 0 0 100% 100%

Asbestos Safety Properties Domestic 5,200 3,781 1,419 n/a 72% - (380 post 2000) Checks 1,000 surveys to upload Properties Communal 136 (Blocks & 98 38 0 72% - 100% by end CC) March 25 Water Safety Properties require LRA 166 109 0 57 57 65% 100% Increase in 40 Checks properties Properties require bacteria test 1 1 0 0 0 100% 100% Domestic No.5541 Asset Summary Performance Trend 2024/25 Qtr. Outstanding/ Blocks No. 341 Total Properties Compliance Non- Due within Dwellings Performance Analysis 1 follow-on works Communal No. 4 Compliance 30 days at risk % Performance

Lift Equipment Passenger & goods lifts 108 ( 9 lifts) 9 0 0 0 100% 100% Safety Checks Stair Lifts 117 97 20 8 82% 95% 35 new lifts to service now programmed in Hoists 76 44 32 6 58% 98% 20 new hoists

Electrical Safety Domestic Dwellings up to 5 5,545 5,528 17 5 17 99.7% 99.6% Checks years old Non- domestic properties 133 133 0 0 0 100% 100%

PAT Testing 37 37 0 0 0 100% 100%

Other Heating Solid Fuel 11 6 5 0 5 54% 91.6% 5 booked in Sources Oil 93 84 9 9 0 90% 100% 9 with new contractor LPG 0 N/A 100% Last 1 changed to ASHP Heat Pumps 143 143 0 0 0 100% 98.5%

Electric 21 21 0 0 0 100% 100%

Block Inspections General 1,212

Gladstone Commercial Air 2 2 0 0 0 100% 100% Conditioning Community Rooms 384 inspections 32 0 0 0 100% 100% for 32 properties P1 P2 P3 Total Average Cost of Repair Damp & Mould Number of Dwellings YTD 12 162 78 252 £57.34 Cases Number of Inspections 200 Completed Number of Repairs Raised YTD 585 Number of Repairs Outstanding 102 Number of repairs completed 273 Average time all works (Days) 57 Completed on Time % 80% No. recurring cases during 0 0 0 0 period

Trend Analysis Key: Performance has improved Performance remains unchanged Properties have become non- since last reporting period since last reporting period compliant since last reporting period

RAG Rating Key: 100% 98-99.9% 0-97.99%

Damp & Mould ‘P’ P1 Emergency e.g. excessive P2 Minor repair works and mould P3 Major Works undertaken by Asset mould or major leak. wash Team e.g. new DPC Ratings Key:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
11.03.25: Q3 Housing Compliance Performance Report Appx 1Report 645 KB DownloadRead as text
PDF
Quarter 3 2024/25: Housing Health & Wellbeing Housing Compliance Assurance ReportReport 599 KB Download

At this meeting

Whole meeting
254Minutes from the previous meeting 18 February 2025On the agenda 255Budget Performance Quarter 3Noted 256Community Plan Performance Quarter 3Decided
257Quarter 3 2024/25 - Housing Health & Wellbeing Housing Compliance Assurance ReportThis decision

Who was there

8 of 18 attended
PP
Councillor Paul PeacockChair, present
RC
Councillor Rowan CozensCommittee Member, present
SC
Councillor Susan CrosbyCommittee Member, present
LB
Councillor Lee BrazierCommittee Member, present
SF
Councillor Simon FordeCommittee Member, present
CP
Councillor Claire PennyCommittee Member, present
PT
Councillor Paul TaylorCommittee Member, present
JK
Councillor Jack KellasCommittee Member, present
NH
Nigel HillSecretary, expected
MF
Matt FinchOfficer, expected
DK
Deborah K JohnsonOfficer, expected
SK
Sanjiv KohliOfficer, expected

All 18 on the meeting page

On this subject at Newark and Sherwood

Search all
  1. Quarter 3 2024/25 - Housing Health & Wellbeing Housing Compliance Assurance ReportThis decision
  2. Housing Compliance Assurance Report Quarter 1Decided
  3. Housing Compliance Assurance Report Quarter 4 2025-26Decided
  4. Housing Compliance Assurance Report - Quarter 3Decided
  5. Quarter 3 2025-26 - Housing Compliance Assurance ReportAgreed
  6. Housing Compliance Assurance Report - Quarter 2Decided

More from Newark and Sherwood Cabinet

All decisions
MeetingDecisionOutcome
15 Sep 2026 Budget Performance Report Quarter 1That Cabinet: (a) note the General Fund projected unfavourable outturn variance of £0.665m; (b) note the Housing Reve... Noted Open
15 Sep 2026 Community Plan Performance Report Quarter 1That Cabinet: a) review the Community Plan Performance Report attached as Appendix 1; b) review the compliance report... Decided Open
15 Sep 2026 Housing Compliance Assurance Report Quarter 1That Cabinet note: a) the exceptions to performance of the housing service compliance functions; b) interim arrangeme... Decided Open
15 Sep 2026 Annual Review of Exempt ItemsThat Cabinet note the report, with any items being released into the public domain if considered no longer being exempt. Noted Open
15 Sep 2026 Progress Towards Net ZeroThat Cabinet: a) notes the Council's 2025/26 corporate emissions position and progress towards the Net Zero 2035 targ... Decided Open