That Cabinet note: a) the exceptions to performance of the housing service compliance functions; and b) the new format for performance for Quarter 3 2024.25 onwards. To enable the Cabinet to monitor performance and compliance relating to the Council’s legal and regulatory landlord responsibilities for 27 building safety measures including fire protection, gas, asbestos, electrical and water. Options Considered: Not applicable.
Word for word from the decision Newark and Sherwood published for this meeting.Source: democracy.newark-sherwooddc.gov.uk
Fire Safety Checks Blocks Requiring FRA and follow 106 0 106 3 106 0% 98.11% Significant WIP on works not competed yet Dwellings within the blocks 929 0 929 3 929 0% 97% Significant WIP not competed yet Fire Alarm Test & Emergency Blocks x 54 54 0 0 0 100% 100% Lighting Weekly Fire Door Communal 117 0 117 0 0 0% 100% By end March will Inspections 3 mthly be completed Fire Door Inspections 6 mthly 100% No longer required. Fire Door Flat Entrance 888 297 591 0 591 33% 10.5% Set up new Inspections Annually programme complete Apr Sprinkler Systems 6 6 0 0 100% 100%
Asbestos Safety Properties Domestic 5,200 3,781 1,419 n/a 72% - (380 post 2000) Checks 1,000 surveys to upload Properties Communal 136 (Blocks & 98 38 0 72% - 100% by end CC) March 25 Water Safety Properties require LRA 166 109 0 57 57 65% 100% Increase in 40 Checks properties Properties require bacteria test 1 1 0 0 0 100% 100% Domestic No.5541 Asset Summary Performance Trend 2024/25 Qtr. Outstanding/ Blocks No. 341 Total Properties Compliance Non- Due within Dwellings Performance Analysis 1 follow-on works Communal No. 4 Compliance 30 days at risk % Performance
Lift Equipment Passenger & goods lifts 108 ( 9 lifts) 9 0 0 0 100% 100% Safety Checks Stair Lifts 117 97 20 8 82% 95% 35 new lifts to service now programmed in Hoists 76 44 32 6 58% 98% 20 new hoists
Electrical Safety Domestic Dwellings up to 5 5,545 5,528 17 5 17 99.7% 99.6% Checks years old Non- domestic properties 133 133 0 0 0 100% 100%
PAT Testing 37 37 0 0 0 100% 100%
Other Heating Solid Fuel 11 6 5 0 5 54% 91.6% 5 booked in Sources Oil 93 84 9 9 0 90% 100% 9 with new contractor LPG 0 N/A 100% Last 1 changed to ASHP Heat Pumps 143 143 0 0 0 100% 98.5%
Electric 21 21 0 0 0 100% 100%
Block Inspections General 1,212
Gladstone Commercial Air 2 2 0 0 0 100% 100% Conditioning Community Rooms 384 inspections 32 0 0 0 100% 100% for 32 properties P1 P2 P3 Total Average Cost of Repair Damp & Mould Number of Dwellings YTD 12 162 78 252 £57.34 Cases Number of Inspections 200 Completed Number of Repairs Raised YTD 585 Number of Repairs Outstanding 102 Number of repairs completed 273 Average time all works (Days) 57 Completed on Time % 80% No. recurring cases during 0 0 0 0 period
Trend Analysis Key: Performance has improved Performance remains unchanged Properties have become non- since last reporting period since last reporting period compliant since last reporting period
RAG Rating Key: 100% 98-99.9% 0-97.99%
Damp & Mould ‘P’ P1 Emergency e.g. excessive P2 Minor repair works and mould P3 Major Works undertaken by Asset mould or major leak. wash Team e.g. new DPC Ratings Key:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Budget Performance Report Quarter 1That Cabinet: (a) note the General Fund projected unfavourable outturn variance of £0.665m; (b) note the Housing Reve...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.