Proposed Solar Farm to the south of Holyhead Road, Albrighton (22/03068/FUL)

Agreed Planning 1 paper

Southern Planning Committee agreed this item on Tuesday 15 November 2022. Below is the council's own wording, with the papers it was decided on.

Item86

Resolved

That in accordance with the Officer recommendation planning permission be granted subject to the conditions set out in Appendix 1, a Section 106 agreement securing funding to refurbish the Grade II Listed Pepperhill Farmhouse and the amendment of condition 22 to read: - All photovoltaic panels and other structures constructed in connection with the approved development shall be physically removed from the Site within 40 years of the date of first export of electricity from the Site and the Site shall be reinstated to agricultural fields. The Local Planning Authority shall be provided with not less than one week’s notice in writing of the intended date for commencement of decommissioning works under the terms of this permission
Word for word from the decision Shropshire published for this meeting. Source: www.shropshire.gov.uk

Follow this further

Built from Shropshire's papers

What the report saysPro

Report to Southern Planning Committee, 69 pages

Committee and date

Southern Planning Committee

15th November 2022

Development Management Report

Responsible Officer: Tracy Darke, Assistant Director of Economy & Place

Summary of Application

Application Number: 22/03068/FUL Parish: Boningale PC Proposal: Construction and operation of a solar photovoltaic farm with battery storage and associated infrastructure, including inverters, substations, security cameras, fencing, access tracks and landscaping Site Address: Proposed Solar Farm to the south of Holyhead Road, Albrighton Applicant: Low Carbon Solar Park 16 Ltd Case Officer: Grahame French email: [email protected]

Fig 1 location

Recommendation:- Approve subject to the conditions set out in Appendix 1 and legal agreement securing funding to refurbish Grade II Listed Pepperhill Farmhouse REPORT

1.0THE PROPOSAL

1.1The application is for a solar generating facility with a capacity of 23 megawatts comprising solar photovoltaic (PV) panels and associated infrastructure including security fencing, security cameras, internal access tracks, underground cabling, inverters, substations, battery storage, grid connection, landscaping and other environmental enhancement measures. The site would generate enough electricity to power approximately 7,642 homes annually.

1.2Construction would take 6 months. The site would have an operational life of up to 40 years, after which it would be decommissioned, and the agricultural land would be reinstated.

1.3The solar park would consist of photovoltaic solar arrays with a maximum height of 3m (limited to 2.1m in the south-western part of the site). The panels would be mounted to a metal frame securely fixed with appropriate ground piles and located in the areas shown on Plan 2 below.

Fig 2 – Site layout

1.4The PV panels would be mounted in rows across the site in an east-west orientation to face the south at 15 to 25 degrees from the horizontal to maximise efficiency, with a maximum height of 3m. There would be a gap of approximately 3- 4 m between each row. The panels would be mounted on a frame, to be installed using spiked foundations of approximately 1-2 m deep.

1.5The following structures are also proposed:

 Inverter Substation  Deer proof perimeter fencing and access gates  CCTV cameras  Batteries within containers  WPD Substation Compound  Communications mast  Customer Switchroom  DNO Switchroom  Landscaping and Biodiversity Enhancement Areas

1.6Batteries: The batteries would be contained within shipping containers or a similar cabin type structure. Each cabin would measure up to approximately 12 m long, 2.5 m wide and 3 m high. Each cabin would be placed on a hardcore base, with a stepped access at one end. The batteries would charge at off-peak times and then supply electricity to the local electricity distribution network at times of peak energy demand and/or when solar irradiation levels are lower, and the solar panels are generating electricity. This means that the Proposed Development can supply electricity to the local distribution network at all times.

1.7Inverters: The inverters and batteries would be within containerised units similar to shipping containers. Each unit would measure approximately 12.2 m long, 2.5 m wide and 2.9m high. Each unit would be placed on a concrete base (with up to 1m deep foundations) and would be similar in appearance to the image in Figure 3.3 above. The inverters would convert the direct current (‘DC’) generated by the solar panels into alternating current (‘AC’). Transformers, contained within the inverter cabins, convert the low voltage output from the inverters to high voltage suitable for feeding into the local electricity distribution network.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Proposed Solar Farm to the south of Holyhead Road, Albrighton (22/03068/FUL)Report 69 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Shropshire

Search all
  1. Proposed Solar Farm to the south of Holyhead Road, Albrighton (22/03068/FUL)This decision
  2. Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow (22/05424/EIA)Approved
  3. Proposed Solar Farm to the west of Berrington, Shrewsbury, SY5 6HA (22/04355/FUL)Refused
  4. Proposed Solar Farm to the south of Hall Lane, Kemberton, Shifnal (22/02441/FUL)Refused
  5. Proposed Solar Farm to the east of Squirrel Lane, Ledwyche, Ludlow (22/02151/FUL)Refused
  6. Proposed Solar Farm At Rhosygadfa, Gobowen, Shropshire (16/05607/FUL)Decided

More from Shropshire Southern Planning Committee

All decisions
MeetingDecisionOutcome
26 May 2026 MinutesThat the of the meetings of the Southern Planning Committee held on Tuesday 24 February 2026 and 14 May 2026 be appro... Approved Open
26 May 2026 Proposed Residential Development Land East of Ford Shrewsbury Shropshire (25/04301/FUL)RESOLVED That contrary to officer recommendation planning permission be refused for the following reasons: · The appl... Refused Open
26 May 2026 Swancote Energy Ltd Anaerobic Digestion Plant at Swancote Farm, Swancote, Bridgnorth (25/02645/VAR)RESOLVED That in accordance with Officer recommendation planning permission be granted subject to the conditions set ... Decided Open
26 May 2026 Proposed Residential Development Land Off Benthall Lane And Bridge Bank Benthall Broseley Shropshire (25/03946/OUT)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... Decided Open
26 May 2026 Proposed Residential Development Land East Of Shaw Lane Albrighton Shropshire (25/03227/REM)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies