Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow (22/05424/EIA)

Approved Planning 1 paper

Southern Planning Committee approved this item on Tuesday 19 September 2023. Below is the council's own wording, with the papers it was decided on.

Item25

Resolved

That in accordance with the Officer recommendation planning permission be approved subject to the conditions set out in appendix one of the report , and a supplementary condition to deliver additional heritage stand-off’
Word for word from the decision Shropshire published for this meeting. Source: www.shropshire.gov.uk

Follow this further

Built from Shropshire's papers

What the report saysPro

Report to Southern Planning Committee, 47 pages

Committee and date

Southern Planning Committee

22nd August 2023

Development Management Report

Responsible Officer: Tracy Darke, Assistant Director of Economy & Place

Summary of Application

Application Number: 22/05424/EIA Parish: Berrington PC Proposal: Proposed Solar Farm (40MW), 12MW co-located battery energy storage facility with sub-station, ancillary buildings, structures, landscaping, emergency lighting and access from A4117 Site Address: Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow Applicant: Anglo Renewables Rock Farm Ltd Case Officer: Grahame French email: [email protected]

Recommendation:- Approve subject to the conditions set out in Appendix 1

Fig 1 location

Page 1 of 47 REPORT

1.0THE PROPOSAL

1.1The application is for a ground mounted solar generating facility with a capacity of 40 megawatts and 12MW of co-located battery energy storage. The facility would also include a sub-station, ancillary buildings, structures, landscaping, associated infrastructure, internal access roads, security, perimeter fencing and CCTV access from the A4117.

1.2The solar arrays would be laid out in multiple parallel rows running east-west across the site covering c80% of the site. The panels would have a tilt of 20 degrees from the horizontal with a maximum height of 3.3m and a minimum ground clearance of 0.8m to allow sheep grazing. They would be coated to minimise glare. Rows would be separated from each other by a minimum of 5m. The frames would either be pile driven or screw anchored into the ground to a typical depth of approximately between 1-1.5m.

1.3Access to the site, during both the construction and operational phase, would be gained via the existing access to rock farm from A4117 linking to a new internal access track (see fig 2).

Fig 2 – Site layout

Page 2 of 47 Fig 3 – Panel plans

1.4The proposals include the following built elements:

 Inverter/Transformer Stations: Fourteen Medium Voltage Power (MPV) stations, each typically measuring 10 m x 2.9 m x 2.45 m would be distributed evenly across the Site and housed in green metal containers.  Battery-based electricity storage containers will allow the store of energy at times of low demand and release to grid at times when demand is high or when solar irradiance is lower. They will typically measure 13.9 m x 3.07 m x 3.11 m.  Security fencing would be installed around the perimeter of the Site at a height up to approximately 2.5 m with the entrance gate of similar construction and height. Clearances above ground, or the inclusion of mammal gates will be included to permit the passage of wildlife.  Grid connection and cabling will extend from the onsite substation to the Western Power Distribution (WPD) substation to the south of the Site, to the west of Squirrel Lane. This cable will be underground.  A 132 kV substation compound will be located in the south-west portion of the Site and will measure 51 m x 20 m at its maximum extent. Items of equipment within the compound would extend to a maximum height of 6.8 m.  Security would be via motion sensor Closed-Circuit Television (CCTV) cameras erected around the Site perimeter on poles at a height up to approximately 2.8 m to allow offsite monitoring. The security cameras would use Passive Infra - Red (PIR) technology, which would provide 24-hour surveillance and avoid the need for night-time lighting at the Site.

Page 3 of 47 1.5 The proposals incorporate a landscape mitigation plan including the following measures:

• Species rich grassland and ecological mitigation area. • Grazing areas for livestock beneath solar panels. • Visual screening and retention of existing trees • The installation of bird and bat boxes.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow (22/05424/EIA)Report 47 pages DownloadRead as text

At this meeting

Whole meeting
22MinutesApproved
25Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow (22/05424/EIA)This decision
26Schedule of Appeals and Appeal DecisionsNoted 27Date of the Next MeetingNoted

On this subject at Shropshire

Search all
  1. Proposed Solar Farm SE of Rock Farm, Rocks Green, Ludlow (22/05424/EIA)This decision
  2. Proposed Solar Farm to the west of Berrington, Shrewsbury, SY5 6HA (22/04355/FUL)Refused
  3. Proposed Solar Farm to the south of Hall Lane, Kemberton, Shifnal (22/02441/FUL)Refused
  4. Proposed Solar Farm to the south of Holyhead Road, Albrighton (22/03068/FUL)Agreed
  5. Proposed Solar Farm to the east of Squirrel Lane, Ledwyche, Ludlow (22/02151/FUL)Refused
  6. Proposed Solar Farm At Rhosygadfa, Gobowen, Shropshire (16/05607/FUL)Decided

More from Shropshire Southern Planning Committee

All decisions
MeetingDecisionOutcome
26 May 2026 MinutesThat the of the meetings of the Southern Planning Committee held on Tuesday 24 February 2026 and 14 May 2026 be appro... Approved Open
26 May 2026 Proposed Residential Development Land East of Ford Shrewsbury Shropshire (25/04301/FUL)RESOLVED That contrary to officer recommendation planning permission be refused for the following reasons: · The appl... Refused Open
26 May 2026 Swancote Energy Ltd Anaerobic Digestion Plant at Swancote Farm, Swancote, Bridgnorth (25/02645/VAR)RESOLVED That in accordance with Officer recommendation planning permission be granted subject to the conditions set ... Decided Open
26 May 2026 Proposed Residential Development Land Off Benthall Lane And Bridge Bank Benthall Broseley Shropshire (25/03946/OUT)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... Decided Open
26 May 2026 Proposed Residential Development Land East Of Shaw Lane Albrighton Shropshire (25/03227/REM)That in accordance with Officer recommendation planning permission be granted subject to the conditions set out in Ap... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies