That contrary to Officer recommendation planning permission be refused for the following reasons: - · The application would result in the loss of best and most versatile agricultural land. · The application would have a harmful ecological effect · The application would have a harmful effect on the landscape
Word for word from the decision Shropshire published for this meeting.Source: www.shropshire.gov.uk
Responsible Officer: Tracy Darke, Assistant Director of Economy & Place
Summary of Application
Application Number: 22/04355/FUL Parish: Berrington PC Proposal: Erection of an up to 30 MW Solar PV Array, comprising ground mounted solar PV panels, vehicular access, internal access tracks, landscaping and associated infrastructure, including security fencing, CCTV, client storage containers and grid connection infrastructure, including substation buildings and off-site cabling Site Address: Proposed Solar Farm to the west of Berrington, Shrewsbury, SY5 6HA Applicant: Econergy International Ltd Case Officer: Grahame French email: [email protected]
Recommendation:- Approve subject to the conditions set out in Appendix 1 and s106 legal agreement providing for off-site Skylark mitigation
Fig 1 location REPORT
1.0THE PROPOSAL
1.1The application is for a solar generating facility with a capacity of 30 megawatts. The solar farm would consist of the following:
Page 1 of 32 • Boundary Fencing • Customer Sub-Stations • MV Power Stations • Fencing and CCTV Cameras • Landscaping Works • Internal Access Tracks • Welfare Units • Compound Area/Track Type 1 • Waterless Toilet • Britcabs x 3 • Set Down Area • Other associated infrastructure
1.2The solar arrays would be laid out in multiple parallel rows running north-south across the site covering c80% of the site. The panels would track the sun throughout the day. Land between and beneath the panels would be used for biodiversity enhancements and seasonal sheep grazing.
1.3Access to the site, during both the construction and operational phase, would be gained via the creation of a new access point off the unnamed highway (locally referred to as ‘Shrewsbury Road’) running along the western flank of the site.
Fig 2 – Site layout
Page 2 of 32 Fig 3 – Panel plans
1.4The proposals incorporate a landscape mitigation plan including the following measures:
• Species rich grassland and ecological mitigation area. • Grazing areas for livestock beneath solar panels. • Visual screening and retention of existing trees • The installation of bird and bat boxes. • Inclusion of species rich grass land to support carbon sequestration on site.
1.5The applicant states that the proposal has the potential to offset the average annual UK electricity consumption of approximately 7,000 houses per annum.
1.6Construction would take 6 months. The site would have an operational life of up to 40 years, after which it would be decommissioned, and the agricultural land would be reinstated.
1.7Construction and operation – It is proposed that impacts during the construction phase are controlled via a Construction Method Statement and Construction Environmental Management Plan. Once installed, the facility would be unmanned, being remotely operated and monitored. Operational access would only be required occasionally. At the end of the 40-year operational lifespan of the solar farm, the site would be restored back to full agricultural use with all equipment and below ground connections removed. The landscape enhancement measures would remain.
1.8The following amendments have been made in response to feedback from planning consultations:
• The proposal has been set in from the boundary treatment adjacent to Cantlop Mill and Newmans Hall Cottage to preserve the amenity of residents in these properties. • Additional hedgerow planting has been provided along the northern boundary of the eastern parcel to provide additional screening of the site from Berrington.
Page 3 of 32 • The main access point has moved from its initial position along the northern boundary off Cliff Hollow, to the unnamed highway along the western flank. This was done to ensure construction traffic avoids Berrington in the interests of highway safety.
2.0SITE LOCATION / DESCRIPTION
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.