Resolved - That full financial approval be given to the scheme 2.07 Bracknell: Coral Reef Roundabout, in the sum of £2,100,000 in 2015/16 on the terms of the funding agreement, as set out in the report, subject to: (1) Written confirmation from WYG, the Independent Assessor, that all aspects of the DfT’s current and requirements for a full business case for a scheme of this size have been met; (2) Satisfactory completion of the formal funding agreement pursuant to the Local Growth Deal.
Word for word from the decision Slough published for this meeting.Source: democracy.slough.gov.uk
Project: Coral Reef Junction Improvement Client: Thames Valley Berkshire Local Enterprise Partnership Job Number: A087383 File Origin:
Document Checking:
Primary Author Jethro Punter Initialled: JP
Contributor Gabriel Davis Initialled: GD
Review By Colin Shields Initialled: CS
Issue Date Status Checked for Issue
1 14.07.14 Draft CS
2 15.07.14 Issued CS
3 16.07.14 Reissue CS
4 Contents
1 Executive Summary .............................................................................................................1 2 Process ...............................................................................................................................3 3 Submitted Information.........................................................................................................4 4 Review ...............................................................................................................................5 5 Summary and Recommendations ....................................................................................... 10
Appendices Appendix A – Business Case Checklist 1 Executive Summary 1.1 This technical note provides an independent review of the Coral Reef Junction Improvement business case submission to the Thames Valley Berkshire Local Enterprise Partnership.
SCHEME SUMMARY
1.2The proposed scheme consists of changes to the Coral Reef roundabout junction, located at the intersection of the A322 with the B3430 and Nine Mile Ride, to form a new signal controlled crossroads.
1.3The scheme forms part of a series of junction improvements on the A322 / A329 corridor linking the M3 and M4 through Bracknell.
REVIEW FINDINGS
1.4The review of the submitted business case identified the following:
1.5Whilst the modelling approach taken in this case is relatively basic (based upon combined peak hour delay savings using individual junction models), it is considered to be reasonable / proportional for the type and complexity of the scheme in question, also taking into account the value of the scheme (with a total scheme cost of less than £5,000,000).
1.5.1 The predicted overall Benefit to Cost Ratio (BCR) of the scheme is detailed within the submitted draft business case as 5.92, which represents a ‘Very High’ Value for Money scheme.
1.5.2 As part of the review process a sensitivity test was requested, assessing the impacts of lower flows through the junction, this additional test resulted in a BCR value of 2.65, which would represent a ‘High’ Value for Money scheme.
1.5.3 The scheme is considered to benefit from limited constraints on delivery, (although it should be noted that this review is not intended to provide an assessment of the proposed scheme design), being located within the existing highway and away from sensitive receptors such as residential dwellings.
1 1.6 The business case as submitted is however incomplete in some areas and will require updating in order to be considered suitable for final submission. As such, whilst the information submitted demonstrates that the scheme presents a value for money scheme with limited constraints upon delivery, it is not possible to fully recommend the business case as submitted.
1.7It is however considered that the underlying case for the scheme appears positive and as such a conditional approval subject to addressing areas of outstanding detail within the submitted case may be appropriate.
2 2 Process MEETINGS
2.1An initial project inception meeting was held at Bracknell Forest Borough Council’s offices on the 21st May 2014 to introduce the scheme and to discuss the timescales and requirements for the full business case submission.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.