Berkshire Local Transport Body

SloughHeldPapers from democracy.slough.gov.uk
Thursday 14 November 2019, 4.00pmHeld 2567 days ago.
Council Chamber - Observatory House25 Windsor Road, SL1 2EL. Open to the public.
13 items, 15 papersAbout 2.9 MB, led by Financial Approval 2.35 Reading: Reading West Railway Station Upgrade.
No exempt items listedEvery item is due to be heard in public.
This meeting was held14 November 2019
13items
15papers
11decisions
–exempt
Running order, sized by papersItem 16 to 28
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Financial Approval 2.35 Reading: Reading West Railway Station Upgrade is the main business.

16
Procedure

Declarations of Interest

It is a principle of the BLTB that the interests of the Thames Valley Berkshire area will take precedence over a member’s own interests or those of their nominating authority. All members must declare, and take relevant action, if they believe they have a pecuniary or other interest on a matter to be considered at the meeting in accordance with the Code of Conduct of the nominating authority or LEP. The Chair will...

17
Report

Minutes of the Meeting held on 18th July 2019

Decision: Resolved – That the minutes of the meeting of the Berkshire Local Transport Body (BLTB) held on 18 th July 2019 be approved as a correct record. Decision page

1 paper, 110 KBSearch inside with Pro
ReportMinutes of the Meeting held on 18th July 2019110 KBDownload
18
Report

Briefing Note - TVB LEP/BLTB 'How We Work'

Decision: Resolved – That the BLTB ‘How We Work’ briefing note be noted. Decision page

ReportBriefing Note: TVB LEP/BLTB 'How We Work'54 KBDownload
19
Report

Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21

Decision: Resolved – That the progress made on schemes previously given programme entry status, as set out in Appendix 1 to the report, be noted. Decision page

1 paper, 195 KBSearch inside with Pro
ReportThames Valley Berkshire Local Growth Deal 2015/16 to 2020/21195 KBDownload
20
Report

Thames Valley Berkshire Local Growth Funds - Call for bids - Process

Decision: Resolved – That a new call for bids be approved as set out in Appendices 1 to 3 to the report and per the agreed LGF prioritisation methodology, subject to the amendment agreed on the eligibility criteria, and further refinement of the weightings and timescales. Decision page

1 paper, 187 KBSearch inside with Pro
ReportThames Valley Berkshire Local Growth Funds: Call for bids: Process187 KBDownload
21
ReportMain business

Financial Approval 2.35 Reading: Reading West Railway Station Upgrade

Decision: Resolved – That scheme 2.35 Reading: Reading West Station Update be given full financial approval in the sum of £3,100,000 over the period 2020/21 on the terms of the funding agreement set out at paragraph 11 step 5 of the report. The observations made by the Independent Assessor regarding delivery and timing risks were noted but it was believed that the existing conditions of the capital grant letter would enable the LEP to work closely with Reading Borough Council and the relevant partners to... Decision page

2 papers, 503 KBSearch inside with Pro
ReportFinancial Approval 2.35 Reading: Reading West Railway Station Upgrade143 KBDownload
ReportTVB LEP Independent Assessors Report: Reading West Station FBC (Ref 2.35)360 KBDownload
22
Report

Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements

Decision: Resolved – That scheme 2.37 Bracknell: A322/A329 Corridor Improvements be given full financial approval in the sum of £2,000,000 in 2020/21 on the terms of the funding agreement set out in paragraph 11 step 5 below. Decision page

2 papers, 474 KBSearch inside with Pro
ReportFinancial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements141 KBDownload
ReportTVB LEP Independent Assessors Report: A322/A329 FBC (Ref 2.37)333 KBDownload
23
Report

Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway

Decision: Resolved – That scheme 2.42 Wokingham: South Wokingham Distributor Road – Eastern Gateway be given full financial approval in the sum of £5,000,000 in 2019/20 on the terms of the funding agreement set out in paragraph 11 step 5 of the report. Decision page

2 papers, 478 KBSearch inside with Pro
ReportFinancial Approval 2.42 Wokingham: South Wokingham Distributor Road: Eastern Gateway155 KBDownload
ReportTVB LEP Independent Assessors Report: Eastern Gateway FBC (Ref 2.42)323 KBDownload
24
Report

Financial Approval 2.43 Wokingham: Barkham Bridge

Decision: Resolved – That scheme 2.43 Wokingham Barkham Bridge be given full financial approval in the sum of £2,100,000 in 2019/20 and £2,135,641 in 2020/21 on the terms of the funding agreement set out at paragraph 11 step 5 of the report. Decision page

2 papers, 465 KBSearch inside with Pro
ReportFinancial Approval 2.43 Wokingham: Barkham Bridge155 KBDownload
ReportTVB LEP Independent Assessors Report: Barkham Bridge FBC (Ref 2.43)310 KBDownload
25
Report

Transport for the South East - Subscription Report Update

Decision: Resolved – That a renewed annual subscription of £58,000 be agreed for TfSE to cover the period 2019/20, with the amount to be split 6 ways between the constituent authorities. Decision page

1 paper, 131 KBSearch inside with Pro
ReportTransport for the South East: Subscription Report Update131 KBDownload
26
Report

TFSE Draft Transport Strategy - consultation response

Decision: Resolved – (a) That it be noted that the three goals around which the TfSE draft Transport Strategy was based aligned well with the objectives of the Strategic Economic Plan and the locally-agreed Berkshire Local Industrial Strategy (BLIS). (b) That the response to the consultation as set out in Appendices 1 & 2 to the report be endorsed. Decision page

1 paper, 293 KBSearch inside with Pro
ReportTFSE Draft Transport Strategy: consultation response293 KBWithheld: personal details
28
Procedure

Date of Next Meeting - 12th March 2020

Read inside all 15 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: Financial Approval 2.35 Reading: Reading West Railway Station Upgrade

Item 21 is where most of this meeting's papers sit: 2 papers, about 503 KB.

Item 21

Financial Approval 2.35 Reading: Reading West Railway Station Upgrade

What is in the pack2 papers, about 503 KB
Report
Financial Approval 2.35 Reading: Reading West Railway Station UpgradeThe report to the committee
143 KB
Report
TVB LEP Independent Assessors Report: Reading West Station FBC (Ref 2.35)The report to the committee
360 KB
Read and search every page of this itemPro opens all 2 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

14 March 2019Financial Approval for 2.29 Wokingham: Winnersh Triangle Park & Ride
18 July 2019Financial Approval for scheme 2.31 Slough: Stoke Road Area Regeneration
18 July 2019Financial Approval for scheme 2.04.4 Wokingham: Arborfield Cross Relief Road
14 November 2019Financial Approval 2.35 Reading: Reading West Railway Station UpgradeThis meeting.

Every paper for this meeting

All 15 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Minutes of the Meeting held on 18th July 2019Item 17, Minutes of the Meeting held on 18th July 2019
110 KB
Kept 4 Oct
Briefing Note: TVB LEP/BLTB 'How We Work'Item 18, Briefing Note - TVB LEP/BLTB 'How We Work'
54 KB
Kept 4 Oct
Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21Item 19, Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21
195 KB
Kept 4 Oct
Thames Valley Berkshire Local Growth Funds: Call for bids: ProcessItem 20, Thames Valley Berkshire Local Growth Funds - Call for bids - Process
187 KB
Kept 4 Oct
Financial Approval 2.35 Reading: Reading West Railway Station UpgradeItem 21, Financial Approval 2.35 Reading: Reading West Railway Station Upgrade
143 KB
Kept 4 Oct
TVB LEP Independent Assessors Report: Reading West Station FBC (Ref 2.35)Item 21, Financial Approval 2.35 Reading: Reading West Railway Station Upgrade
360 KB
Kept 4 Oct
Financial Approval 2.37 Bracknell: A322/ A329 Corridor ImprovementsItem 22, Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
141 KB
Kept 4 Oct
TVB LEP Independent Assessors Report: A322/A329 FBC (Ref 2.37)Item 22, Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
333 KB
Kept 4 Oct
Financial Approval 2.42 Wokingham: South Wokingham Distributor Road: Eastern GatewayItem 23, Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway
155 KB
Kept 4 Oct
TVB LEP Independent Assessors Report: Eastern Gateway FBC (Ref 2.42)Item 23, Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway
323 KB
Kept 4 Oct
Financial Approval 2.43 Wokingham: Barkham BridgeItem 24, Financial Approval 2.43 Wokingham: Barkham Bridge
155 KB
Kept 4 Oct
TVB LEP Independent Assessors Report: Barkham Bridge FBC (Ref 2.43)Item 24, Financial Approval 2.43 Wokingham: Barkham Bridge
310 KB
Kept 4 Oct
Transport for the South East: Subscription Report UpdateItem 25, Transport for the South East - Subscription Report Update
131 KB
Kept 4 Oct
TFSE Draft Transport Strategy: consultation responseItem 26, TFSE Draft Transport Strategy - consultation response
293 KB
Kept 4 Oct
Withheld: personal detailsRead here
BLTB Forward PlanItem 27, BLTB Forward Plan
57 KB
Kept 4 Oct

Last time, and what carried over

The committee last met on 18 July 2019. 10 of its items lead into this meeting; 1 item is new. Point at any item to follow a thread. Procedural items are left out.

Jul18
18 July 201915 items, 15 papers
Held
carried over
Nov14
14 November 201913 items, 15 papers
Held
4
Minutes of the Meeting held on 14th March 2019
5
Briefing Note - TVB LEP/BLTB 'How We Work'
6
Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21
7
Allocation of the remaining Local Growth Funds
8
Financial Approval for scheme 2.04.4 Wokingham: Arborfield Cross Relief Road
9
Financial Approval for scheme 2.31 Slough: Stoke Road Area Regeneration
10
Review of Prioritisation Methodology
11
BSTF & BLTB Assurance Framework
12
Heathrow Airport Expansion - proposed consultation 2 response
13
TfSE - Proposal to Seek Statutory Status - Formal Response
14
BLTB Forward Plan
15
Date of Next Meeting - 14th November 2019
17
Minutes of the Meeting held on 18th July 2019
18
Briefing Note - TVB LEP/BLTB 'How We Work'
19
Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21
20
Thames Valley Berkshire Local Growth Funds - Call for bids - Process
21
Financial Approval 2.35 Reading: Reading West Railway Station Upgrade
22
Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
23
Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway
24
Financial Approval 2.43 Wokingham: Barkham Bridge
25
Transport for the South East - Subscription Report UpdateNew this time
26
TFSE Draft Transport Strategy - consultation response
27
BLTB Forward Plan
28
Date of Next Meeting - 12th March 2020

The threads

  • Minutes of the Meeting held on 14th March 2019 leads to item 17, Minutes of the Meeting held on 18th July 2019
  • Minutes of the Meeting held on 14th March 2019 leads to item 28, Date of Next Meeting - 12th March 2020
  • Briefing Note - TVB LEP/BLTB 'How We Work' leads to item 18, Briefing Note - TVB LEP/BLTB 'How We Work'
  • Briefing Note - TVB LEP/BLTB 'How We Work' leads to item 21, Financial Approval 2.35 Reading: Reading West Railway Station Upgrade
  • Briefing Note - TVB LEP/BLTB 'How We Work' leads to item 22, Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
  • Briefing Note - TVB LEP/BLTB 'How We Work' leads to item 23, Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway
  • Briefing Note - TVB LEP/BLTB 'How We Work' leads to item 24, Financial Approval 2.43 Wokingham: Barkham Bridge
  • Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21 leads to item 19, Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21
  • Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21 leads to item 20, Thames Valley Berkshire Local Growth Funds - Call for bids - Process
  • Allocation of the remaining Local Growth Funds leads to item 19, Thames Valley Berkshire Local Growth Deal 2015/16 to 2020/21
  • Allocation of the remaining Local Growth Funds leads to item 20, Thames Valley Berkshire Local Growth Funds - Call for bids - Process
  • Financial Approval for scheme 2.04.4 Wokingham: Arborfield Cross Relief Road leads to item 21, Financial Approval 2.35 Reading: Reading West Railway Station Upgrade
  • Financial Approval for scheme 2.04.4 Wokingham: Arborfield Cross Relief Road leads to item 22, Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
  • Financial Approval for scheme 2.04.4 Wokingham: Arborfield Cross Relief Road leads to item 23, Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway
  • Financial Approval for scheme 2.04.4 Wokingham: Arborfield Cross Relief Road leads to item 24, Financial Approval 2.43 Wokingham: Barkham Bridge
  • Financial Approval for scheme 2.31 Slough: Stoke Road Area Regeneration leads to item 21, Financial Approval 2.35 Reading: Reading West Railway Station Upgrade
  • Financial Approval for scheme 2.31 Slough: Stoke Road Area Regeneration leads to item 22, Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
  • Financial Approval for scheme 2.31 Slough: Stoke Road Area Regeneration leads to item 23, Financial Approval 2.42 Wokingham: South Wokingham Distributor Road - Eastern Gateway
  • Financial Approval for scheme 2.31 Slough: Stoke Road Area Regeneration leads to item 24, Financial Approval 2.43 Wokingham: Barkham Bridge
  • Heathrow Airport Expansion - proposed consultation 2 response leads to item 26, TFSE Draft Transport Strategy - consultation response
  • TfSE - Proposal to Seek Statutory Status - Formal Response leads to item 26, TFSE Draft Transport Strategy - consultation response
  • BLTB Forward Plan leads to item 27, BLTB Forward Plan
  • Date of Next Meeting - 14th November 2019 leads to item 28, Date of Next Meeting - 12th March 2020

Not carried over

Review of Prioritisation Methodology, BSTF & BLTB Assurance Framework do not return this time.

See the 18 July meeting

This committee over time

Every Berkshire Local Transport Body meeting we have read, the dates it has set for the future, and each time those dates have changed.

41 meetings, 2013 to 2025Dot size shows the number of papers
2013201520172019202120232025
HeldThis meeting
MeetingItemsPapers
6 Mar 2025Thursday
0items
0papers
HeldOpen
7 Nov 2024Thursday
0items
0papers
HeldOpen
4 Jul 2024Thursday
0items
0papers
HeldOpen
7 Mar 2024Thursday
6items
4papers
HeldOpen
9 Nov 2023Thursday
6items
8papers
HeldOpen
13 Jul 2023Thursday
9items
8papers
HeldOpen
9 Mar 2023Thursday
11items
9papers
HeldOpen
10 Nov 2022Thursday
9items
12papers
HeldOpen
14 Jul 2022Thursday
10items
10papers
HeldOpen
10 Mar 2022Thursday
0items
0papers
HeldOpen
11 Nov 2021Thursday
11items
9papers
HeldOpen
15 Jul 2021Thursday
10items
7papers
HeldOpen
11 Mar 2021Thursday
9items
7papers
HeldOpen
12 Nov 2020Thursday
13items
10papers
HeldOpen
16 Jul 2020Thursday
0items
0papers
HeldOpen
15 Jul 2020Wednesday
19items
16papers
HeldOpen
4 Jun 2020Thursday
13items
11papers
HeldOpen
12 Mar 2020Thursday
11items
11papers
HeldOpen
14 Nov 2019Thursday, this meeting
13items
15papers
18 Jul 2019Thursday
15items
15papers
HeldOpen
14 Mar 2019Thursday
12items
13papers
HeldOpen
31 Jan 2019Thursday
10items
10papers
HeldOpen
15 Nov 2018Thursday
12items
17papers
HeldOpen
19 Jul 2018Thursday
18items
16papers
HeldOpen
15 Mar 2018Thursday
10items
9papers
HeldOpen
16 Nov 2017Thursday
13items
16papers
HeldOpen
20 Jul 2017Thursday
10items
9papers
HeldOpen
16 Mar 2017Thursday
10items
15papers
HeldOpen
17 Nov 2016Thursday
7items
8papers
HeldOpen
21 Jul 2016Thursday
11items
9papers
HeldOpen
17 Mar 2016Thursday
8items
8papers
HeldOpen
19 Nov 2015Thursday
9items
12papers
HeldOpen
16 Jul 2015Thursday
8items
5papers
HeldOpen
19 Mar 2015Thursday
6items
4papers
HeldOpen
20 Nov 2014Thursday
13items
16papers
HeldOpen
24 Jul 2014Thursday
11items
9papers
HeldOpen
19 Mar 2014Wednesday
0items
0papers
HeldOpen
13 Mar 2014Thursday
7items
5papers
HeldOpen
14 Nov 2013Thursday
7items
5papers
HeldOpen
18 Jul 2013Thursday
7items
5papers
HeldOpen
14 Mar 2013Thursday
6items
3papers
HeldOpen

Follow the Berkshire Local Transport Body

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Slough, Berkshire Local Transport Body

Berkshire Local Transport Body: 3 kinds of updateSlough, sent the same day
PDF
15 papers published for 14 NovemberFinancial Approval 2.35 Reading: Reading West Railway Station Upgrade and 14 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 14 NovemberThe committee's resolutions, the day they are recorded
ABC
"financial" found in 4 papersFinancial Approval 2.35 Reading: Reading West Railway Station Upgrade and Financial Approval 2.37 Bracknell: A322/ A329 Corridor Improvements
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Berkshire Local Transport Body, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies