That Cabinet: 1. Approved the scheme for an extension to CO2 as set out in the body of the report and at Appendix A; 2. Authorised officers to submit the following: i . A full planning application for an extension to CO2 based on the emerging designs contained at Appendix A ii. A planning application for approximately 120 new residential units on the CO1 site to be submitted at a later date. 3. Authorised officers to begin a procurement process for the appointment of a main build contractor and enter into the relevant contracts to deliver the new Civic Offices.
Word for word from the decision Thurrock published for this meeting.Source: democracy.thurrock.gov.uk
GRAYS, THURROCK RIBA STAGE 2 INITIAL RESPONSE - REVISION A
Issued 30th October 2018 WHERE DO WE STAND?
We stand with you. Whoever you are – a client, a colleague, a supplier, someone who lives or works in, or is just passing through, a building we’ve designed. We stand with you because, for us, architecture is all about people. Get to know them and what’s important to them, connect with them and collaborate, deal with them respectfully and with integrity and, together, you can solve any problem, overcome any challenge and achieve any ambition. That’s what it takes to create sustainable, innovative, valuable and positive architecture. Architecture that improves lives, builds communities and enhances society. Life touching design.
www.lsiarchitects.co.uk CONTENTS 1.0 INITIAL STAGE 2 DESIGN (RESPONSE TO STAGE 1 SIGN OFF COMMENTS) 1.1 GROUND FLOOR
1. More details on the type of café being proposed (coffee shop with pre packed food) Island cafe with bench seating and separate store room is Registrar Service Awaiting final brief for Registrars Service, Covered Walkway Entrance Entrance layout subject to change proposed. Based on Camden Civic Offices Cafe model of pre- 5.8 m² Waiting Room 26.0 m²
Reception Area 3 Person Office packaged food with no on-site cooking Meeting 1 23.4 m²
9.2m²
Fire Access & Staff Corridor Homeless Waiting 2. Members were keen to have an outdoor space for the café 24.9 m² Registration room 2 Dash indicates
Circulation 3 Meeting 2 10.8 m² Outdoor seating area shown. Uses defensive landscaping to
Circulation 2 overhang above 8.9 m² Observation Ceremonial Room 1 provide disconnect from public area and stop the cafe door from 20.3 m²
8.1m² 9.1 m²
14.3m² being an additional main entrance into the building Meeting 3 Registration room 1
17.3m² 8.9 m² 9.8 m² PACE Archive (UNDER 17.1 m² Family Room 15.3 m² 14.2 m² STAIR)
3. Café and meetings rooms to be switched around Meeting 4 9.7 m² Stair Lobby These areas have been switched as shown. Registry Archive 10.4 m² Stair 9.6 m² utilises space under second stair to provide enough space for Secure Door homeless waiting area Lift 1 Existing ventilation 5.0 m² structure Double set of sliding Visitor WC doors in curved Visitor WC 4. What are the plans for the space beneath the stairs, don’t configuration 13.0 m² 13.3 m²
want it to be dead space CIVIC HUB 8,500 Lift 2 5.0 m² Cl. 1.7 m² 2.2 m² Riser AWC Steps and lift address level change between These areas under the stair will be used to house the base- ENTRANCE 4.3 m² floor level of extension Feature Stair Proposed Link to and of CO2
ght C02 - Exact station for the floor staff and as one of the areas of self service 25.5 m²
at this point Full headhi
basestation Circulation 1 Location TBC
Indicative
3,000 41.2 m² terminals as shown 8 Person lift
Under stair space houses Secure base station for floor Line 5. Concerned about the outside space alongside the registrars walkers and self service ove tes
terminals entrance to make sure it does not become a crime hotspot Dash indica overhang ab
Customer Service Hub Secure fence line added at the point of the Registrars entrance 238.4 m² Cafe Store Lightwell garden. 9.9 m² No public access but as shown. Area adjacent to the covered walkway is under 11,240
brings light and landscaping views development with Secure by Design and has the potential to be Cafe Island into cafe. Escape route from open but protected via defensive landscaping and planting Cafe CO2 passes through
10,740 147.5 m²
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Thurrock Transport Strategy Adoption2.1 Cabinet approved the Thurrock Transport Strategy given in Appendix 1 to be progressed to Full Council for adoptio...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.