TSAR Traffic Signal Refurbishment - Hull Road/Osbaldwick Link Road
ApprovedExecutive3 papers
Decision Session - Executive Member for Transport - Expired approved this item on Monday 22 June 2020. Below is the council's own wording, with the papers it was decided on.
That Option 1, the proposed crossing refurbishment as shown in the drawing at Annex B of the report, be approved. Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue to be operated and repaired economically. That Option 1, the proposed crossing refurbishment as shown in the drawing at Annex B of the report, be approved. Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue to be operated and repaired economically.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport - Expired, 6 pages
Summary
1. The traffic signalling equipment at this site is life expired, has become difficult and costly to maintain and needs to be replaced.
2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.
3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, cycling facility alterations have been proposed that offer an improvement.
4. A decision is required to approve the proposed alterations.
Recommendations
5. The Executive Member is asked to approve Option 1.
Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.
Background
6. A report was brought to the Executive Member for Transport and Planning on 12 November 2015 to seek approval to undertake the 5-year ‘TSAR’ (Traffic Signal Asset Renewal) programme. 7. This programme entails a replacement of life expired traffic signal assets around York. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.
8. To date, 32 sets of signals have been refurbished and a further 5 are programmed in for the 20/21 financial year.
Consultation
9. Due to efforts to bring the area’s bus lane into significant use and slight changes to the cycling facilities at the crossing, a consultation has been carried out to offer key user groups an opportunity to have their say on the proposed scheme.
10. A summary of the consultation feedback can be found in Annex A.
Options
11. The following options are available:
12. Option 1 – Approve the proposed crossing refurbishment shown in drawing Annex B.
13. Option 2 – Do not approve the presented option.
Analysis
Option 1
Description of Changes
14. Refurbish the existing pedestrian / cyclist crossing to the North of the junction into a standard Toucan crossing provided with all new equipment, including signal heads, poles, cabling, cabinets, detectors, communications and ducting.
15. Introduction of specialised vehicle detection equipment for high speed junctions. 16. Signal Controller to be relocated from the western pedestrian island to the rear of the main foot/cycleway west of the junction to increase ease of access.
17. Eastern Pedestrian Island to be reshaped in order to improve alignment with main foot/cycleway at the Eastern most extreme of the junction.
18. Crossing point realigned at the Eastern foot/cycleway.
19. Bring the existing bus lane back into full operation including improved bus detection to allow for better bus priority.
20. Bus Lane carriageway improvement works.
21. The estimated cost of the work to the Traffic Signal at the junction of Hull Road and Osbaldwick Link Road detailed in Annex B is £350,000.00
Reasoning
22. Replacement of the traffic signal technology is the fundamental purpose of this project, as per item 6.
23. The betterment of cycling facilities associated with the Toucan crossing at this location constitutes an ‘easy win’ improvement in line with City of York Council’s user hierarchy. The facilities are brought in line with current standards.
Impact on vehicular traffic
24. This option has a negligible impact upon the capacity of the junction however, by adding Microprocessor Optimised Vehicle Actuation (MOVA) control to this high speed junction the site will be safer and will likely see some minor improvements to vehicle journey time through it.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport - Expired at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.