City of York Council

TSAR Traffic Signal Refurbishment - Hull Road/Osbaldwick Link Road

Approved Executive 3 papers

Decision Session - Executive Member for Transport - Expired approved this item on Monday 22 June 2020. Below is the council's own wording, with the papers it was decided on.

Item4

Resolved

That Option 1, the proposed crossing refurbishment as shown in the drawing at Annex B of the report, be approved. Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue to be operated and repaired economically. That Option 1, the proposed crossing refurbishment as shown in the drawing at Annex B of the report, be approved. Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue to be operated and repaired economically.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Decision Session - Executive Member for Transport - Expired, 6 pages

Summary

1. The traffic signalling equipment at this site is life expired, has become difficult and costly to maintain and needs to be replaced.

2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.

3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, cycling facility alterations have been proposed that offer an improvement.

4. A decision is required to approve the proposed alterations.

Recommendations

5. The Executive Member is asked to approve Option 1.

Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.

Background

6. A report was brought to the Executive Member for Transport and Planning on 12 November 2015 to seek approval to undertake the 5-year ‘TSAR’ (Traffic Signal Asset Renewal) programme. 7. This programme entails a replacement of life expired traffic signal assets around York. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.

8. To date, 32 sets of signals have been refurbished and a further 5 are programmed in for the 20/21 financial year.

Consultation

9. Due to efforts to bring the area’s bus lane into significant use and slight changes to the cycling facilities at the crossing, a consultation has been carried out to offer key user groups an opportunity to have their say on the proposed scheme.

10. A summary of the consultation feedback can be found in Annex A.

Options

11. The following options are available:

12. Option 1 – Approve the proposed crossing refurbishment shown in drawing Annex B.

13. Option 2 – Do not approve the presented option.

Analysis

Option 1

Description of Changes

14. Refurbish the existing pedestrian / cyclist crossing to the North of the junction into a standard Toucan crossing provided with all new equipment, including signal heads, poles, cabling, cabinets, detectors, communications and ducting.

15. Introduction of specialised vehicle detection equipment for high speed junctions. 16. Signal Controller to be relocated from the western pedestrian island to the rear of the main foot/cycleway west of the junction to increase ease of access.

17. Eastern Pedestrian Island to be reshaped in order to improve alignment with main foot/cycleway at the Eastern most extreme of the junction.

18. Crossing point realigned at the Eastern foot/cycleway.

19. Bring the existing bus lane back into full operation including improved bus detection to allow for better bus priority.

20. Bus Lane carriageway improvement works.

21. The estimated cost of the work to the Traffic Signal at the junction of Hull Road and Osbaldwick Link Road detailed in Annex B is £350,000.00

Reasoning

22. Replacement of the traffic signal technology is the fundamental purpose of this project, as per item 6.

23. The betterment of cycling facilities associated with the Toucan crossing at this location constitutes an ‘easy win’ improvement in line with City of York Council’s user hierarchy. The facilities are brought in line with current standards.

Impact on vehicular traffic

24. This option has a negligible impact upon the capacity of the junction however, by adding Microprocessor Optimised Vehicle Actuation (MOVA) control to this high speed junction the site will be safer and will likely see some minor improvements to vehicle journey time through it.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
YK2246 ConsultationAppendix A 3 pages Download
PDF
YK2246 Hull Road at Osbaldwick Link RoadAppendix B 1 pages Download
PDF
TSAR Traffic Signal Refurbishment: Hull Road/Osbaldwick Link RoadReport 6 pages DownloadRead as text

At this meeting

Whole meeting
2MinutesApproved
4TSAR Traffic Signal Refurbishment - Hull Road/Osbaldwick Link RoadThis decision
5The Groves Area Experimental Traffic Regulation OrderNoted

On this subject at York

Search all
  1. TSAR Traffic Signal Refurbishment - Hull Road/Osbaldwick Link RoadThis decision
  2. TSAR Traffic Signal Refurbishment – Junction of Malton Road / New LaneApproved
  3. TSAR Traffic Signal Refurbishment – Barbican Road/Paragon StreetApproved
  4. TSAR Traffic Signal Refurbishment - Clifton Moorgate / Hurricane Way YK2239Approved
  5. TSAR Traffic Signal Refurbishment - Clifton Moorgate / Hurricane Way YK2239Deferred
  6. TSAR Traffic Signal Refurbishment - Wigginton Road / Crichton Avenue YK2221Approved

More from York Decision Session - Executive Member for Transport - Expired

All decisions
MeetingDecisionOutcome
21 Mar 2023 Acomb Road Safety Updatei. That the council promote and relaunch the existing campaign to recruit a school crossing patroller on Acomb Road; ... Noted Open
21 Mar 2023 Active Travel Programme Updatei. Noted the update on the progress of the Active Travel Programme contained within this report; Reason: To provide i... Noted Open
21 Mar 2023 Active Travel Programme – Hospital Fields Road Schemei. Approved the advertisement of amendments to the Traffic Regulation Order (TRO) to implement the parking restrictio... Approved Open
21 Mar 2023 Resident Parking (Recommendations from Scrutiny)i. Noted the response to the scrutiny recommendations detailed within paragraph 25 of this report; ii. Noted that the... Noted Open
14 Mar 2023 Exclusion of Press and PublicThat the press and public be excluded from the meeting during the consideration of annexes D and E for Agenda Items 5... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies