Decision Session - Executive Member for Transport - Expired approved this item on Tuesday 3 November 2020. Below is the council's own wording, with the papers it was decided on.
i. Approve the proposed signal refurbishment with additional controlled pedestrian crossings shown in the drawing at Annex C. Reason: This will achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically. i. Approve the proposed signal refurbishment with additional controlled pedestrian crossings shown in the drawing at Annex C. Reason: This will achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport - Expired, 10 pages
Summary
1. The traffic signalling equipment at this site is life expired, has become difficult and costly to maintain and needs to be replaced.
2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.
3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, an option which looks to include new pedestrian crossing facilities has been proposed as one of the two options put forward.
A decision is required to approve the proposed alterations.
Recommendations
4. The Executive Member is asked to:
Approve Option 2 including the additional TRO implementation/extension for no waiting at any time along the south west access road as noted at points 24 and 25 of this paper.
Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.
This option also includes the introduction of pedestrian crossings at the junction which provides further benefits for users and links directly with the CYC Council Plan in its aim to improve opportunities for Getting around Sustainably. This addition is generally supported by those individuals and groups responding to the preliminary design consultation however, concerns were raised about the impact these changes would have on general traffic and bus journey times.
Background
5. A report was brought to the Executive Member for Transport and Planning on 12th November 2015 to seek approval to undertake the 5- year ‘TSAR’ (Traffic Signal Asset Renewal) programme.
6. This programme entails a replacement of life expired traffic signal assets around York. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.
7. To date, 33 sets of signals have been refurbished and a further 5 are programmed in for the 20/21 financial year.
Consultation
8. Due to the possible introduction of pedestrian crossings at the location alongside previous issues regarding vehicle capacity at the junction, a consultation has been carried out to offer local ward councillors, internal and external stakeholders an opportunity to have their say on the proposed scheme.
9. A summary of the consultation feedback can be found in Annex A.
Options
10. The following options are available:
11. Option 1 – Approve the proposed like for like signal refurbishment shown in the drawing at Annex B
12. Option 2 – Approve the proposed signal refurbishment with additional controlled pedestrian crossings shown in the drawing at Annex C
13. Option 3 – Do not approve either of the proposed signal refurbishments presented. Analysis
Option 1
Description of Changes
14. Refurbishment of all on site Traffic Signal Equipment
15. The estimated cost of the work to the Traffic Signal at the junction of Wigginton Road and Crichton Avenue detailed in Annex B is £120,000.00
Reasoning
16. Replacement of the traffic signal technology is the fundamental purpose of this project, as per item 6.
Impact on vehicular traffic
17. This option has no direct impact on vehicular capacity at the junction however the update of the site will establish a link to the communications network to ensure reliable fault monitoring and better junction monitoring.
Impact on Pedestrians
18. The option will have no impact on Pedestrians
Impact on Cyclists
19. The option will have no impact on Cyclists
Safety Considerations
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport - Expired at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.