City of York Council

TSAR Traffic Signal Refurbishment - Wigginton Road / Crichton Avenue YK2221

Approved Executive 7 papers

Decision Session - Executive Member for Transport - Expired approved this item on Tuesday 3 November 2020. Below is the council's own wording, with the papers it was decided on.

Item34

Resolved

i. Approve the proposed signal refurbishment with additional controlled pedestrian crossings shown in the drawing at Annex C. Reason: This will achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically. i. Approve the proposed signal refurbishment with additional controlled pedestrian crossings shown in the drawing at Annex C. Reason: This will achieve the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.
Word for word from the decision York published for this meeting. Source: democracy.york.gov.uk

Follow this further

Built from York's papers

What the report saysPro

Report to Decision Session - Executive Member for Transport - Expired, 10 pages

Summary

1. The traffic signalling equipment at this site is life expired, has become difficult and costly to maintain and needs to be replaced.

2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.

3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, an option which looks to include new pedestrian crossing facilities has been proposed as one of the two options put forward.

A decision is required to approve the proposed alterations.

Recommendations

4. The Executive Member is asked to:

Approve Option 2 including the additional TRO implementation/extension for no waiting at any time along the south west access road as noted at points 24 and 25 of this paper.

Reason: This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically.

This option also includes the introduction of pedestrian crossings at the junction which provides further benefits for users and links directly with the CYC Council Plan in its aim to improve opportunities for Getting around Sustainably. This addition is generally supported by those individuals and groups responding to the preliminary design consultation however, concerns were raised about the impact these changes would have on general traffic and bus journey times.

Background

5. A report was brought to the Executive Member for Transport and Planning on 12th November 2015 to seek approval to undertake the 5- year ‘TSAR’ (Traffic Signal Asset Renewal) programme.

6. This programme entails a replacement of life expired traffic signal assets around York. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.

7. To date, 33 sets of signals have been refurbished and a further 5 are programmed in for the 20/21 financial year.

Consultation

8. Due to the possible introduction of pedestrian crossings at the location alongside previous issues regarding vehicle capacity at the junction, a consultation has been carried out to offer local ward councillors, internal and external stakeholders an opportunity to have their say on the proposed scheme.

9. A summary of the consultation feedback can be found in Annex A.

Options

10. The following options are available:

11. Option 1 – Approve the proposed like for like signal refurbishment shown in the drawing at Annex B

12. Option 2 – Approve the proposed signal refurbishment with additional controlled pedestrian crossings shown in the drawing at Annex C

13. Option 3 – Do not approve either of the proposed signal refurbishments presented. Analysis

Option 1

Description of Changes

14. Refurbishment of all on site Traffic Signal Equipment

15. The estimated cost of the work to the Traffic Signal at the junction of Wigginton Road and Crichton Avenue detailed in Annex B is £120,000.00

Reasoning

16. Replacement of the traffic signal technology is the fundamental purpose of this project, as per item 6.

Impact on vehicular traffic

17. This option has no direct impact on vehicular capacity at the junction however the update of the site will establish a link to the communications network to ensure reliable fault monitoring and better junction monitoring.

Impact on Pedestrians

18. The option will have no impact on Pedestrians

Impact on Cyclists

19. The option will have no impact on Cyclists

Safety Considerations

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix AAppendix A 8 pages Download
PDF
Appendix BAppendix B 1 pages Download
PDF
Appendix CAppendix C 1 pages Download
PDF
Appendix DAppendix D 1 pages Download
PDF
TSAR Traffic Signal Refurbishment: Wigginton Road / Crichton Avenue YK2221Report 10 pages DownloadRead as text
PDF
View as HTML (34./2) 39 KBAppendix 39 KB Copy on its way
PDF
View item 34. as HTML 69 KBReport 69 KB Copy on its way

At this meeting

Whole meeting

On this subject at York

Search all
  1. TSAR Traffic Signal Refurbishment - Wigginton Road / Crichton Avenue YK2221This decision
  2. TSAR Traffic Signal Refurbishment – Junction of Malton Road / New LaneApproved
  3. TSAR Traffic Signal Refurbishment – Barbican Road/Paragon StreetApproved
  4. TSAR Traffic Signal Refurbishment - Clifton Moorgate / Hurricane Way YK2239Approved
  5. TSAR Traffic Signal Refurbishment - Clifton Moorgate / Hurricane Way YK2239Deferred
  6. TSAR Traffic Signal Refurbishment - Hull Road/Osbaldwick Link RoadApproved

More from York Decision Session - Executive Member for Transport - Expired

All decisions
MeetingDecisionOutcome
21 Mar 2023 Acomb Road Safety Updatei. That the council promote and relaunch the existing campaign to recruit a school crossing patroller on Acomb Road; ... Noted Open
21 Mar 2023 Active Travel Programme Updatei. Noted the update on the progress of the Active Travel Programme contained within this report; Reason: To provide i... Noted Open
21 Mar 2023 Active Travel Programme – Hospital Fields Road Schemei. Approved the advertisement of amendments to the Traffic Regulation Order (TRO) to implement the parking restrictio... Approved Open
21 Mar 2023 Resident Parking (Recommendations from Scrutiny)i. Noted the response to the scrutiny recommendations detailed within paragraph 25 of this report; ii. Noted that the... Noted Open
14 Mar 2023 Exclusion of Press and PublicThat the press and public be excluded from the meeting during the consideration of annexes D and E for Agenda Items 5... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies