TSAR Traffic Signal Refurbishment - Clifton Moorgate / Hurricane Way YK2239
DeferredExecutive7 papers
Decision Session - Executive Member for Transport - Expired deferred this item on Tuesday 1 December 2020. Below is the council's own wording, with the papers it was decided on.
i. That a decision be deferred to a January decision session to allow for local residents and Ward Councillors an additional opportunity to engage in the decision making process. To ensure that local residents and Ward Councillors have had sufficient opportunity to engage in the decision making process. i. That a decision be deferred to a January decision session to allow for local residents and Ward Councillors an additional opportunity to engage in the decision making process. To ensure that local residents and Ward Councillors have had sufficient opportunity to engage in the decision making process.
Word for word from the decision York published for this meeting.Source: democracy.york.gov.uk
Report to Decision Session - Executive Member for Transport - Expired, 11 pages
Summary
1. The traffic signalling equipment at this site is life expired, has become difficult and costly to maintain and needs to be replaced.
2. The TSAR (Traffic Signal Asset Renewal) programme is the means by which life expired traffic signal assets across the city are refurbished.
3. Although the programme is primarily about asset renewal, there is scope to take advantage of ‘easy wins’ whilst refurbishing the equipment. To that end, an option which looks to include new pedestrian crossing facilities has been proposed as one of the two options put forward.
A decision is required to approve the proposed alterations.
Recommendations
4. The Executive Member is asked to:
Approve Option 1
Reason:
This option achieves the core aim of replacing the life-expired traffic signal asset such that it can continue be operated and repaired economically whilst also providing slight improvements to cycling and walking infrastructure.
Option 1 also takes into account, and supports, the major transport project scheme which is responsible for the dualling of York’s Outer Ring Road (ORR) and associated junction improvements as part of that scheme.
Although the introduction of a signal controlled right turn egress option from Hurricane Way put forward in Option 2 would reduce traffic volumes approaching the ORR, the low number of vehicles wanting to make this manoeuvre does not represent value for money given the estimated expenses associated with its introduction.
Background
5. The TSAR (Traffic Signal Asset Renewal) programme has been in place since 2015 and is responsible for the replacement of life expired traffic signal assets around York.
6. The focus is on replacing equipment that is liable to imminent failure, rather than seeking to improve congestion or achieve a similar transport improvement goal. However, where ‘easy wins’ can be achieved at the same time as replacing obsolete equipment, these will be taken advantage of.
7. To date, 35 sets of signals have been refurbished and a further 3 are programmed in for the 20/21 financial year.
Consultation
8. An electronic consultation has been carried out with local ward councillors, internal and external stakeholders to offer an opportunity to comment on the proposed TSAR scheme designs put forward for consideration in this report.
9. A summary of the consultation feedback can be found in Annex A.
10. The design options put forward are also informed by public consultation work undertaken as part of the Major Transport Projects team’s work on proposed revisions to the ORR roundabouts in close proximity to the Clifton Moor section of the A1237.
11. The consultation at point 10 was undertaken during February/March 2019 and encompassed a range of methods including manned/unmanned information displays at the local supermarket and West Offices, leaflet and questionnaire drops to local business and residential properties, social media campaigns and a dedicated email inbox for respondent’s views.
12. An additional piece of feedback from this consultation exercise indicated a desire to explore the possibility of introducing a signal controlled right turn from Hurricane Way to Clifton Moor Gate Southbound. This proposal has been explored and is represented in this report by Option 2.
Options
13. The following options are available:
14. Option 1 – Approve the proposed like for like signal refurbishment shown in the drawing at Annex B
15. Option 2 – Approve the proposed signal refurbishment with additional introduction of a signal controlled right hand turn option from Hurricane Way onto Clifton Moor Gate Southbound shown in the drawing at Annex C
Analysis
Option 1
Description of Changes
16. Refurbishment of all on site Traffic Signal Equipment
17. Realignment of the pedestrian / cyclist crossing over Hurricane Way so that it meets current guidance.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Decision Session - Executive Member for Transport - Expired at York and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.