HPK/2024/0290 - Land off Bowden Hey Road, Chapel-en-le-Frith
ApprovedPlanning1 paper
AI summaryHigh Peak Borough Council approved a new B8 industrial storage unit on land off Bowden Hey Road, Chapel-en-le-Frith, subject to conditions covering highways, drainage, trees and biodiversity.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedDelegated to Head of Development Services
MoneyNot stated
What happens nextSection 106 Agreement neededPlus pre-commencement conditions
Who it affectsChapel-en-le-Frith areaIncludes users of footpath 75
What was decided
Planning permission was granted for a new industrial storage unit (B8 use) with associated earthworks, hardstandings and landscaping. Report 3.1
Authority was delegated to the Head of Development Services, in consultation with the Committee Chair, to make minor wording changes to conditions before the decision is issued.
Why
The site is allocated employment land under Chapel Neighbourhood Plan Policy EP5, and the principle of development is supported by Local Plan policies and Chapter 6 of the NPPF. Report 2.5, 7.7, 7.8, 7.14, 7.13
The building has been cut into the landscape by approximately 4m (from 227.0m to 223.7m) to reduce its visual impact, in line with neighbourhood plan design guidance. Report 7.25, 7.26, P275, P276
Statutory consultees including the Highways Authority, Lead Local Flood Authority, Environmental Health and the Parish Council raised no objections once additional information was provided. Report P76, P97, P198, P108
What happens next
A Section 106 Agreement is required to secure significant onsite biodiversity net gain, supported by a Habitat Management and Monitoring Plan for a minimum 30-year period. Report P143, P145, 7.14
Pre-commencement conditions must be discharged, including an Arboricultural Method Statement, a surface water drainage scheme, and a Construction Environmental Management Plan. Report P158, P199, P149
Offsite biodiversity units must be purchased from a Habitat Bank to reach the 10% net gain target once onsite gains are maximised, with a corrected metric addressing the site area discrepancy. Report P144, P125, P152
Options considered
Chosen: Approve with conditions. Site is allocated for employment, design responds to landscape, and consultees' concerns were addressed. Report P4, P5, 7.14, 7.26
Implications
Legal: A Section 106 Agreement is needed to secure biodiversity net gain onsite and to record offsite unit purchases on the Gain Sites Register. Report P139, P145
Climate: PV solar panels are proposed on the western roof ridge, and drainage design must accommodate 1 in 100 year plus 40% climate change rainfall. Report 3.8, P226
Risk: Public footpath 75 crosses the site and must remain open, unobstructed and on its legal alignment, with signage to warn vehicle users. Report 2.3, P72, P74, P83
Other: The Conservation Officer found no harm to the setting of the Chapel-en-le-Frith Town End conservation area due to a retained natural buffer. Report P252
Other: Derbyshire Constabulary recommended a 2.4m black powder coated paladin perimeter fence to address security given rising crime in the area. Report P88, P94, P95
Other: The Lead Local Flood Authority lifted its objection after revised drainage information, but required detailed design, management and maintenance conditions. Report P196, P198, P199
Who and where
Local economy and businesses seeking new industrial storage space in Chapel-en-le-Frith Report 7.12, 7.13
Users of Chapel-en-le-Frith Public Footpath No. 75, which crosses the site Report 2.3, P72
Neighbouring residents of the Bowden Lane Industrial Estate and A6 corridor Report 2.1
Derbyshire Wildlife Trust and biodiversity interests, given the impact on grassland of borderline Local Wildlife Site quality Report P114, P138
Timeline
9th July 2024: Application registered with the council Report P3
3rd November 2025: Development Control Committee approved the application with conditions Report P2
Plain English for the jargon
B8 use: Use class for storage and distribution, covering industrial storage units.
BNG: Biodiversity Net Gain, the requirement that development delivers at least 10% more biodiversity than before.
TPO: Tree Preservation Order, legal protection for specific trees.
NPPF: National Planning Policy Framework, central government planning policy.
CNP: Chapel Neighbourhood Plan, a local planning document covering Chapel-en-le-Frith.
LLFA: Lead Local Flood Authority, in this case Derbyshire County Council.
PRoW: Public Right of Way, in this case Footpath No. 75.
LCA: Landscape Character Area, here the Settled Valley Pastures.
SuDS: Sustainable Drainage Systems, surface water management.
LWS: Local Wildlife Site, a locally designated area of nature conservation value.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item26/60
Resolved
That planning permission be approved as set out in the report; and 2. That in the event of any changes being needed to the wording of the Committee’s decision (such as to delete, vary or add conditions/ informatives /planning obligations or reasons for approval/refusal) prior to the decision being issued, the Head of Development Services be delegated authority to do so in consultation with the Chair of the Committee, provided that the changes do not exceed the substantive nature of the Committee’s decision.
Word for word from the decision High Peak published for this meeting.Source: democracy.highpeak.gov.uk
HIGH PEAK BOROUGH COUNCIL DEVELOPMENT CONTROL COMMITTEE
Date 3rd November 2025
Application No: HPK/2024/0290 Location Land off Bowden Hey Road, Chapel-en-le-Frith Proposal New Industrial Storage Unit (B8) on land at Bowden Hey Road including associated earthworks, hardstandings, landscaping Applicant [name removed], Ainley Pension Scheme Agent [name removed], Bowker Sadler Architecture Parish/ward Chapel / Chapel East Date registered 9th July 2024 If you have a question about this report please contact: James Stannard, Tel. 01298 28400 extension 4298, [email protected]
SUMMARY OF RECOMMENDATION
Approve with Conditions
1. REASON FOR COMMITTEE DETERMINATION
1.1This application has been brought before the Development Control Committee owing to the fact the application constitutes Major Development.
2. DESCRIPTION OF THE SITE AND ITS SURROUNDINGS
2.1The application site relates to a greenfield site situated immediately to the south of the existing Bowden Lane Industrial Estate – a Primary Employment Site - and to the west of the A6 dual carriageway at the north-eastern fringes of Chapel-en-le-Frith.
2.2The site slopes quite sharply away in a southerly and easterly direction resulting a significant change in levels between the northern and southern parts of the site and is characterised by trees and other natural vegetation.
2.3The northern boundary is characterised by natural vegetation and a row of trees, some of which are protected by a Tree Preservation Order (TPO). A public footpath (HP6/75/1) runs parallel with the northern boundary within the site, which extends from Bowden Lane and across to higher ground beyond the A6.
1 2.4 A gap exists between existing buildings located adjacent to the northern boundary within the Industrial Estate which provides opportunity to serve a new vehicular access into the site.
2.5The site is an allocated Employment Site as per Chapel Neighbourhood Plan (CNP) Policy EP5.
2.6The vast majority of the site is located within the built-up area boundary of Chapel-en-le-Frith with a small section of land to the south-east being situated within the open countryside and within the ‘Settled Valley Pastures’ Landscape Character Area.
2.7The site lies within the setting of the Town End part of the Chapel Conservation Area, which borders the site to the south west
3. DESCRIPTION OF THE PROPOSAL
3.1Further to positive pre-application advice in June 2022, this application seeks full planning permission for a single industrial storage unit (B8 Use), together with associated earthworks, hardstanding and landscaping necessary to facilitate the proposed development.
3.2The original description of development made reference to “future provision for Phase 2 development”. However, due to the fact that this area (to the north-east of the proposed development) is required to facilitate on site Biodiversity Net Gain (BNG), the applicant has agreed to a change of the description which omits any reference to Phase 2 development.
3.3During the consultation process, the application has been subject to additional technical information and revised plans. For clarity, the plans documents and visualisations that are subject of an assessment within this report are set out below:
Plans
- Location Plan (Ref: 1000D) - Proposed Floor Plans (Ref: 1001C) - Section and 3D View (Ref: 1002C) - Proposed Elevations (1 of 2) (Ref: 1003C) - Proposed Elevations (2 of 2) (Ref: 1004C) - Indicative Cladding Types (Ref: 1005B) - Proposed Site Plan and 3D Views (Ref: 1006E) - Topographic Survey (Ref: 1007B) - Site Sections A-A (Ref: 1008B) - Site Sections B-B (Ref: 1009B) - Roof Plan (Ref: 1010B) - Site Block Plan (Ref: 1011D) - Long Sections (Ref: G05-P3) - Cut and Fill Volumes (Ref: G00-P5)
2 - Landscape Mitigation Plan (Ref: 1800 Rev 4)
Technical Documents
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.