CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
May28Thursday

Cabinet (decommissioned, for the Executive after

SouthwarkHeldPapers from moderngov.southwark.gov.uk
Thursday 28 May 2026, 4.00pmHeld 182 days ago.
Ground Floor Meeting Room GO2A160 Tooley Street, London SE1 2QH. Open to the public except for exempt items.
34 items, 60 papersAbout 18 MB, led by Next Steps on Developing Long Term Plans for the Delivery of New Council Homes.
1 item with exempt partsExclusion of Press and Public may be taken in private.
This meeting was held28 May 2026
34items
60papers
24decisions
1exempt
Running order, sized by papersItem 1 to 33
ReportsProcedureExempt parts

AI summaryWhat the committee decided

Checked against 53 papers PDF briefing Pro

Southwark Cabinet agreed steps for 11,000 new council homes, continued the £383m kitchen and bathroom programme, and allowed up to £5.2 million for integrated community support. It approved school expansions and rate relief estimated at £3,570,884, changed the Elephant and Castle agreement, and required eight-week responses on community wardens, psychosis, mental health and health services.

23decisions 6agreed5approved12noted 12with money Topicsgovernance, housing, procurement, regeneration, finance
8
Noted
Southwark Community Wardens Service (Housing, Environment and Community Safety Scrutiny Sub-Committee)Southwark Cabinet noted the Community Wardens Service review recommendations and required the relevant cabinet member to bring a response report to cabinet within eight weeks. [D]
–
Read in full
9
Noted
Prevalence of Psychosis and Access to Mental Health Services for the BME Community in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)Southwark Cabinet noted a scrutiny review on psychosis and mental health access for the BME community, and requires a response report within eight weeks [D][P1].
–
Read in full
10
Noted
Access to Health Services in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)Cabinet noted the scrutiny recommendations on access to health services. The adult care and public health cabinet members must bring a report to Cabinet within eight weeks. [D]
–
Read in full
11
Agreed
Council Plan 2014/15 - 2017/18Cabinet agreed the Council Plan for 2014 to 2018, consultation and progress monitoring [D]. Implementation resources will be identified during budget setting for 2015/16 and beyond [P44]. The report has no new financial implications [P51].
–
Read in full
12
Noted
Fairer Future Annual Performance Report 2013/14Southwark Cabinet noted delivery against the Council Plan, with all ten Fairer Future promises recorded as achieved by the end of 2013/14 [D][P19]. The report had no immediate resource implications [P27].
–
Read in full
13
Noted
Blue Bermondsey Business Improvement District Proposal and BallotSouthwark Cabinet welcomed the successful Bermondsey BID ballot, endorsed the Blue Bermondsey BID Company and nominated a councillor to its board. [D][P37] The company has a mandate to apply a 1.5% levy to liable properties, and administering the ballot cost the council approximately £2,000. [P39][P44]
–
Read in full
14
Noted
Next Steps on Developing Long Term Plans for the Delivery of New Council HomesSouthwark Cabinet agreed next steps for the 11,000 new council homes programme, including December 2014 asset and pipeline reports and a council controlled funding vehicle [D]. It also joined new delivery to existing stock management and agreed resident consultation on engagement principles [D].
–
Read in full
15
Noted
Major Works Status Report Incorporating Warm, Dry and SafeSouthwark Cabinet noted a March 2014 update on Warm, Dry and Safe works, which were on course to be fully committed by the end of 2015/16. Resources would be reassessed against commitments to deliver kitchens and bathrooms and finish the £383m programme. [D][P9][P2] [D][P7][P60]
£383mAdditional resources needed to complete WDS [P12][P100]
Read in full
16
Agreed
Integrated Community Support - A New Commissioning Strategy, underpinned by an Ethical Care CharterCabinet agreed Southwark's ethical care charter and a strategy for integrated community support [D] [P2] [P3]. The service is planned from July 2015, with up to £5.2 million allowed for implementation [D] [P5] [P60].
£5.2mBudgets, Better Care Fund monies and earmarked reserves may contribute [P5] [P100].
Read in full
17
Noted
School Places Strategy UpdateSouthwark Cabinet approved Phoenix and Keyworth expansions and conditionally approved Wilkinson House for expanded Bellenden School [D]. It noted north primary pressure and forecast demand for year 7 places; £16m was already agreed for primary strategy, with further secondary funding needed [D][P103].
£16mPrimary strategy funding already agreed [P103]
Read in full
18
Approved
Non-Domestic Rates - Discretionary Rate Relief Policy for Retail Relief, Reoccupation Relief and New Build Empty Property ReliefCabinet approved Southwark Council's discretionary rate relief policy for retail, reoccupation and new build empty properties. [D] [P1] Granting the reliefs has no cost to the council, with estimated relief of £3,570,884 for financial year 2014/15. [P32] [P34] [P44]
£3.57m2014/15 estimate, centrally funded, no council cost. [P32] [P34] [P44]
Read in full
19
Agreed
Elephant and Castle Regeneration ProgressSouthwark Council's Cabinet agreed to amend the Elephant and Castle regeneration agreement, delay the Crossways Church site transfer, revise sustainable energy provisions and approve changing the purpose of two council land areas to planning purposes. No new costs or receipts arise from the decision. [D] [P32]
–
Read in full
20
Approved
Gateway 1 Abbeyfield Estate HINE (Maydew House) WorksSouthwark Cabinet approved an EU restricted procurement strategy for an Abbeyfield Estate HINE works contract estimated at £22m over 208 weeks. [D] The Leader delegated award to the housing cabinet member; the total estimated scheme cost is £24.2m. [D]
£24.2mEstimated total £24.2m, including £22m works and £2.2m fees [D]
Read in full
21
Noted
Review of Void Disposal StrategySouthwark Cabinet revised void disposal rules, requiring properties over £500,000 to meet another category. It raised the delegated disposal limit to £750,000, subject to constitutional changes, and moved from annual sales targets to housing investment need assessments.
£750,000Applies to estimated value, subject to constitutional confirmation.
Read in full
22
Noted
Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24Southwark Cabinet noted the 2013/14 capital outturn and approved budget changes for future spending. [D] The General Fund's spending was £36.9m below budget and the housing investment programme's was £8.5m below budget, with both variances moved into 2014/15 and later years. [P14] [P17] [P95] [P139]
£36.9mGeneral Fund and housing investment variances below budget. [P14] [P17] [P95]
Read in full
23
Noted
Revenue Outturn Report 2013/14, including Treasury ManagementCabinet noted the 2013/14 revenue outturns and approved general fund movements above £250,000. [D] [P1] [P4] It also noted an investment of up to £200,000 in the Municipal Bond Agency, subject to Council Assembly approval on 16 July 2014. [D] [P1]
£200,000Municipal Bond Agency investment [P1]
Read in full
24
Agreed
Nominations to Centre for Literacy in Primary Education and Safeguarding Adults Partnership Board 2014/15Cabinet agreed two nominations for 2014/15: Councillor Jasmine Ali to the Centre for Literacy in Primary Education and Councillor Dora Dixon Fyle to the Safeguarding Adults Partnership Board. [D]
–
Read in full
25
Noted
Motions Referred from Council AssemblySouthwark Cabinet noted seven motions and assigned action on Meat Free Mondays to the cabinet member for public health, parks and leisure [D].
–
Read in full
26
Agreed
Disposal of Site A - 5 Nunhead Green, London SE15Southwark Cabinet authorised sale of the freehold at 5 Nunhead Green, SE15 3QQ and delegated terms to the head of property. A capital receipt is expected, and an alternative bidder may be used if the recommended purchaser does not contract, subject to best consideration. [D] [P2] [P3] [P21] [P37]
–
Read in full
27
Approved
Gateway 2 - Contract Award Approval: Lift Maintenance ContractSouthwark Cabinet approved Liftec Lifts Ltd for the north lift contract and Guideline Lift Services Ltd for the south contract. [D] The contracts start on 2 January 2015, with estimated totals of £12.3m and £10.0m and options for two further one year extensions. [D]
£12.3mAnnual estimates £1.8m and £1.4m [D]
Read in full
28
Agreed
Proposal to Lease Northcott House HostelSouthwark Cabinet agreed to lease Northcott House for step down accommodation for 45 adults, subject to acceptable terms [D] [P9]. Full occupancy could avoid the £119,088 per annum net cost of equivalent bed and breakfast placements [P37] [P39].
£119,088B&B cost pressure reducible at full occupancy [P37] [P39]
Read in full
29
Approved
Gateway 1 - Procurement Strategy Approval - Appointment of Contractors for Primary Expansion ProgrammeCabinet approved the iESE procurement strategy for appointing two contractors to the primary schools expansion programme. [D] The works contracts have an estimated total value of £60.5m, plus £0.7m for each package's preconstruction services, with projects from £1.5m to £10.0m. [P2]
£60.5mPlus £0.7m per package for preconstruction [P2]
Read in full
30
Approved
Gateway 1 - Procurement Strategy Approval - Heating and Water ContractsSouthwark Cabinet approved two heating and water contracts for the north and south of the borough [D]. The term is five years from 1 April 2016, with a potential extension of three years plus two years, and an estimated value of £153m [D].
£153mEstimated annual costs: A £7.9m; B £7.4m [D]
Read in full
1 procedural item (apologies, declarations, minutes and the like) is not summarised.
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Next Steps on Developing Long Term Plans for the Delivery of New Council Homes is the main business; one item may be taken in private.

1
Procedure

Apologies

To receive any apologies for absence.

2
Procedure

Notification of any items of Business which the Chair Deems Urgent

In special circumstances, an item of business may be added to an agenda within five clear working days of the meeting.

3
Report

Notice of Intention to conduct business in a closed meeting, and any representations received

To note the items specified which will be considered in a closed meeting.

2 papers, 45 KBSearch inside with Pro
ReportFive day notice form for agenda18 KBDownload
ReportNotification of Closed Business for Urgent Consideration Form27 KBDownload
4
Procedure

Disclosure of Interests and Dispensations

View the declarations of interest for item 4. Members to declare any interests and dispensation in respect of any item of business to be considered at this meeting.

5
Procedure

Public Question Time (15 Minutes)

To receive any questions from members of the public which have been submitted in advance of the meeting in accordance with the cabinet procedure rules.

6
Report

Minutes

To approve as a correct record the minutes of the open section of the meeting held on 2 July 2014.

Decision: That the minutes of the meeting held on 2 July 2014 be approved as a correct record and signed by the chair. Decision page

ReportCabinet minutes open: 2 July 201467 KBDownload
7
Procedure

Deputation Requests

To consider any deputation requests.

8
Report

Southwark Community Wardens Service (Housing, Environment and Community Safety Scrutiny Sub-Committee)

To note the recommendations of the review of the Southwark Community Wardens Service and that the relevant cabinet member bring a report to cabinet within eight weeks.

Decision: That the recommendations of the review of the Southwark Community Wardens Service be noted and that Councillor Michael Situ, cabinet member for environment, recycling, community safety and volunteering, bring back a report to cabinet within eight weeks, in order to respond to the overview and scrutiny committee. Decision page

2 papers, 229 KBSearch inside with Pro
AppendixAppendix 1: Southwark Community Wardens169 KBDownload
ReportReport: Southwark Community wardens60 KBDownload
9
Report

Prevalence of Psychosis and Access to Mental Health Services for the BME Community in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)

To note the recommendations of the review of the prevalence of psychosis and access to mental health services for the BME community in Southwark and that the relevant cabinet member bring a report back to cabinet within eight weeks.

Decision: That the recommendations of the review of the prevalence of psychosis and access to mental health services for the BME community in Southwark be noted and that Councillor Barrie Hargrove, cabinet member for public health, parks and leisure, bring back a report to cabinet within eight weeks, in order to respond to the overview and scrutiny committee. Decision page

2 papers, 943 KBSearch inside with Pro
AppendixAppendix: Mental Health Services BME875 KBDownload
ReportReport: Mental health services BME68 KBDownload
10
Report

Access to Health Services in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)

To note the recommendations of the review of access to health services in Southwark and that the relevant cabinet member bring back a report to cabinet within eight weeks.

Decision: That the recommendations of the review of access to health services in Southwark be noted and that Councillor Dora Dixon- Fyle (cabinet member for adult care, arts and culture) and Councillor Barrie Hargove (cabinet member for public health, parks and leisure) bring back a report to cabinet within eight weeks, in order to respond to the overview and scrutiny committee. Decision page

2 papers, 985 KBSearch inside with Pro
AppendixAppendix: Access to Healthcare Services922 KBDownload
ReportReport: Access health services63 KBDownload
11
Report

Council Plan 2014/15 - 2017/18

To agree the proposed council plan 2014/15 – 2017/18 and the proposed period of consultation on the cabinet’s proposal for this plan.

Decision: That the proposed council plan 2014/15 - 2017/18 be agreed. 2. That the proposed period of consultation on the cabinet’s proposals for the council plan 2014/15 - 2017/18 be agreed. 3. In line with above, officers be instructed to work with cabinet members to develop a detailed performance schedule for each council plan theme. 4. That the proposed arrangements for monitoring and reporting on progress against the council plan 2014/15 - 2017/18 be agreed. Decision page

3 papers, 987 KBSearch inside with Pro
AppendixAppendix 2: Council Plan 2014/15: 2017/18: Indicative Delivery Plan118 KBDownload
AppendixAppendix :1 Council Plan 2014/15: 2017/18773 KBDownload
ReportReport: Council Plan 2014/15: 2017/1896 KBDownload
12
Report

Fairer Future Annual Performance Report 2013/14

To note the progress made against the objectives and targets for 2013/14 in the council plan 2011/12 – 2013/14.

Decision: That delivery against the council plan 2011/12 - 2013/14 be noted. Decision page

ReportReport: Fairer Future Annual Performance Report 2013/1483 KBDownload
13
Report

Blue Bermondsey Business Improvement District Proposal and Ballot

To welcome the outcome of the ballot for a business improvement district in Bermondsey and endorse the formation of the Blue Bermondsey BID company.

Decision: That the outcome of the ballot for a Business Improvement District (BID) in Bermondsey as announced on 4 July 2014 be welcomed and the formation of the Blue Bermondsey BID Company be endorsed. 2. That the confirmation from officers that the Blue Bermondsey BID arrangements do not conflict with council strategies and policies affecting the proposed BID area be noted. 3. That Councillor Leo Pollak be nominated to serve on the Blue Bermondsey BID Company Board. Decision page

4 papers, 2.8 MBSearch inside with Pro
AppendixAppendix 1: Bermondsey BID arrangements166 KBDownload
AppendixAppendix 2: Bermondsey BID Business Survey2.4 MBDownload
AppendixAppendix 3: Bermondsey BID Equalities Analysis125 KBDownload
ReportReport: Bermondsey BID108 KBDownload
14
ReportMain business

Next Steps on Developing Long Term Plans for the Delivery of New Council Homes

To note the progress underway and agree the next steps for the direct delivery programme that forms part of the overall commitment to build 11,000 new council homes over 30 years from 2013 – 2043.

Decision: That the progress underway within the Direct Delivery programme that forms part of the commitment to build 11,000 new council homes over 30 years from 2013 to 2043 be noted. 2. That under the head of major works, the future programme delivery for new council homes with the ongoing asset management of the existing housing stock be brought together. 3. That strategic director of housing and community services be instructed to: put in place the necessary capacity to oversee further programme... Decision page

4 papers, 4.2 MBSearch inside with Pro
AppendixAppendix 1: Draft Charter of Principles75 KBDownload
AppendixAppendix 2: Schedule of directly funded housing delivery programme schemes209 KBDownload
AppendixAppendix 3: Details of currently funded housing delivery schemes3.7 MBDownload
ReportReport: Long term plans for the delivery of new council homes162 KBDownload
15
Report

Major Works Status Report Incorporating Warm, Dry and Safe

To note the status of the housing investment programme with particular reference to warm, dry and safe programme and the progress of the strategic safety works programme.

Decision: That the status of the housing investment programme with particular reference to the warm, dry and safe (WDS) programme be noted. 2. That it be noted that the current warm, dry and safe programme is on course to be fully committed by the end of 2015/16. 3. That the progress of the strategic safety works programme be noted. All substantial risk high rise blocks have now been completed and nearly all the high moderate risk blocks originally identified have now been completed. Additional schemes... Decision page

1 paper, 1.2 MBSearch inside with Pro
ReportReport and appendices: Major Works Status Report incorporating Warm Dry and Safe1.2 MBDownload
16
Report

Integrated Community Support - A New Commissioning Strategy, underpinned by an Ethical Care Charter

To agree the Southwark ethical care strategy and the commissioning strategy for integrated community support which will fully deliver this charter.

Decision: That the Southwark ethical care charter as set out in paragraph 20 of the report be agreed. 2. That the commissioning strategy for integrated community support (including homecare), as set out in paragraphs 34 - 36 of the report, which is underpinned by the Southwark ethical care charter, be agreed. 3. That the proposed variation and extension of the council’s universal homecare contracts to ensure that, by the end of October 2014, (a) care workers are paid for their travel time, (b) care... Decision page

3 papers, 326 KBSearch inside with Pro
AppendixAppendix 1: Our shared vision for my life at home for people who need care115 KBDownload
AppendixAppendix 2: A Set of Values for Home Care47 KBDownload
ReportReport: Integrated Community Support164 KBDownload
17
Report

School Places Strategy Update

To note the updated forecast for primary school reception places and in particular the demand for additional primary school places in the north of the borough and approve the changes for schools in the borough. To note the update on new primary free schools in the south of the borough.

Decision: That the updated forecast of primary school reception places be noted and, in particular, the demand for additional primary school places in the north of the borough. 2. That the inclusion of Phoenix Primary School in the programme for permanent expansion of primary school places to provide two additional forms of entry on a temporary basis from September 2015 and a permanent basis from September 2016, as referred to in paragraphs 25 and 26 of the report be approved. 3. That the further... Decision page

1 paper, 163 KBSearch inside with Pro
ReportReport: School Places Strategy Update163 KBDownload
18
Report

Non-Domestic Rates - Discretionary Rate Relief Policy for Retail Relief, Reoccupation Relief and New Build Empty Property Relief

To approve the discretionary rate relief policy for retail relief, reoccupation relief and new build empty property relief.

Decision: That the discretionary rate relief policy attached as Appendix A of the report for retail relief, reoccupation relief and new build empty property relief be approved. Decision page

1 paper, 109 KBSearch inside with Pro
AppendixReport and appendix: Discretionary rate relief109 KBDownload
19
Report

Elephant and Castle Regeneration Progress

To agree to amend the Regeneration Agreement dated 23 July 2010 between the London Borough of Southwark and Lend Lease (Elephant & Castle) Limited as set out in the recommendations.

Decision: That the regeneration agreement dated 23 July 2010 between the London Borough of Southwark and Lend Lease (Elephant & Castle) Limited be amended as follows: (a) the transfer of the Crossways Church site is delayed until the earlier of the completion of the replacement Crossways Church at Hampton Street or 30 September 2016. (b) to revise MUSCO provisions with the sustainable energy provisions provided within the Planning Committee approval (minute 6) on 15 January 2013. 2. That it be confirmed... Decision page

6 papers, 895 KBSearch inside with Pro
AppendixAppendix A: Plan of land to transfer to Lend Lease imminently303 KBDownload
AppendixAppendix B: Plan of Heygate land to be appropriated299 KBDownload
AppendixAppendix C: Rationale for appropriation of Heygate Land30 KBDownload
AppendixAppendix D: Plan of land for replacement Crossways Church126 KBDownload
AppendixAppendix E: Rationale for appropriation of land for replacement Crossways Church29 KBDownload
ReportReport: Elephant and Castle108 KBDownload
20
Report

Gateway 1 Abbeyfield Estate HINE (Maydew House) Works

To approve the procurement strategy outlined for the Abbeyfield Estate HINE (Maydew House) works contract.

Decision: Decisions of the Cabinet 1. That the procurement strategy outlined in the report for the Abbeyfield Estate HINE ( Maydew House) works contract at an estimated value of £22m for an estimated period of 208 weeks be approved. 2. That the estimated internal and external fees of £2.2m making a total estimated scheme cost of £24.2m be noted. Decision of the Leader 3. That authority be delegated to the cabinet member for housing to award the contract for the reasons set out in paragraph 17 of the... Decision page

1 paper, 138 KBSearch inside with Pro
ReportReport: Gateway 1 Abbeyfield Estate HINE (Maydew House) Works138 KBDownload
21
Report

Review of Void Disposal Strategy

To note the progress of disposals of void housing properties since the last report to cabinet in May 2011 and agree to revise the criteria for disposals in the void disposal strategy.

Decision: That the progress of disposals of void housing properties since the last report to cabinet in May 2011 be noted. 2. That the continuing requirement to raise capital receipts for the housing investment programme, and the role of void disposals in providing a proportion of those receipts be noted. 3. That the general increase in property values in Southwark since the review of 2011 be noted. 4. That the criteria for disposals in the void disposal strategy from those agreed by cabinet in May 2011... Decision page

1 paper, 126 KBSearch inside with Pro
ReportReport: Review of voids disposal strategy126 KBDownload
22
Report

Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24

To note the outturn position for 2013/14 for the general fund capital programme and the outturn position for 2013/14 for the housing investment programme. To approve virements and funded variations and the re-profiling of the forecast expenditure and resources in the new financial year and future yaers for both programmes.

Decision: That the outturn position for 2013/14 for the general fund capital programme including the overall position of the programme for the period 2013/14 to 2023/24 as detailed in appendices A and D of the report be noted. 2. That the outturn position for 2013/14 for the housing investment programme, including the overall position of the programme for the period 2013/14 to 2021/22, as detailed in Appendix B of the report be noted. 3. That the virements and funded variations to the general fund and... Decision page

5 papers, 291 KBSearch inside with Pro
AppendixAppendix A: General fund summary monitoring position43 KBDownload
AppendixAppendix B: Housing investment programme summary monitoring position27 KBDownload
AppendixAppendix C: Budget virements and variations at quarter 4 2013/1425 KBDownload
AppendixAppendix D: General fund programme detail33 KBDownload
ReportReport: 2013-14 Quarter 4 Capital Monitor Outturn163 KBDownload
23
Report

Revenue Outturn Report 2013/14, including Treasury Management

To present the council’s financial position for the general fund, the housing revenue account (HRA) and planned use of reserves and balances for 2013/14.

Decision: That the following be noted: general fund outturn for 2013/14 and movement on reserves housing revenue account’s (HRA) outturn for 2013/14 and movement on reserves the schools budget outturn, which has been taken to the dedicated schools grant reserve the collection fund’s year-end surplus the treasury management activity for the year the investment of up to £200,000 in the Municipal Bond Agency (subject to council assembly approval on 16 July 2014). 2. That the performance for the collection... Decision page

3 papers, 334 KBSearch inside with Pro
AppendixAppendix A: Budget movements to be approved and noted80 KBDownload
AppendixAppendix B: Movements in reserves71 KBDownload
ReportReport: 2013-14 Outturn: Revenue183 KBDownload
24
Report

Nominations to Centre for Literacy in Primary Education and Safeguarding Adults Partnership Board 2014/15

To agree nominations to Centre for Literacy in Primary Education (CLPE) and Safeguarding Adults Partnership Board for the 2014/15 municipal year.

Decision: That the following nominations be agreed for the 2014/15 municipal year: Councillor Jasmine Ali - Centre for Literacy in Primary Education (CLPE) Councillor Dora Dixon- Fyle - Safeguarding Adults Partnership Board Decision page

ReportReport: Nominations to CLPE and Safeguarding Adults Partnership Board49 KBDownload
25
Report

Motions Referred from Council Assembly

To consider motions referred from council assembly 26 March 2014: A Vision for Southwark Vision for Localism Local decision making Free school meals Meat free Mondays Regulation for payday lenders Fixed odds betting terminals

Decision: That all the following motions be noted and that Councillor Barrie Hargrove, cabinet member for public health, parks and leisure lead on the action arising from the motion relating to Meat Free Mondays. A Vision for Southwark 1. That council assembly welcomes the work that this administration has done over the last four years to deliver the council’s vision of creating a fairer future for Southwark. 2. That council assembly notes that since 2010, the council has faced almost £80 million in... Decision page

1 paper, 138 KBSearch inside with Pro
ReportReport: Motions Referred from Council Assembly138 KBDownload
26
Report

Disposal of Site A - 5 Nunhead Green, London SE15

To authorise the disposal of the council’s freehold interest in site A – 5 Nunhead Green, SE15 3QQ.

Decision: That the disposal of the council’s freehold interest in Site A - 5 Nunhead Green, SE15 3QQ (“the property”), as shown edged black on the plan in Appendix 1 of the report be authorised, to the party on the terms outlined in the closed version of the report. That authority be delegated to the head of property to agree the detailed terms of the transaction and negotiate any other items considered necessary. 2. That the disposal of the property to an alternative bidder be authorised should the... Decision page

2 papers, 241 KBSearch inside with Pro
AppendixAppendix 1: Map159 KBDownload
ReportReport: Disposal of Nunhead Site A82 KBDownload
27
Report

Gateway 2 - Contract Award Approval: Lift Maintenance Contract

To approve the award of contract A (north of the borough) and contract B (south of the borough).

Decision: That the award of contract A (north of the borough) lift maintenance contract to Liftec Lifts Ltd be approved for the estimated sum of £1.8m per annum for a period of five (5) years from 2 January 2015 with the option to extend by a further two (2) years in (1+1 yearly increments) making a total estimated contract value of £12.3m. 2. That the award of contract B (south of the borough) lift maintenance contract to Guideline Lift Services Ltd be approved for the estimated sum of £1.4m per annum... Decision page

3 papers, 920 KBSearch inside with Pro
ReportBackground document: GW3 Open 25 October 2013410 KBDownload
ReportBackground document: GW3 Open 7 November 2012377 KBDownload
ReportReport: GW2 Lift Maintenance Contract133 KBDownload
28
Report

Proposal to Lease Northcott House Hostel

To agree to lease Northcott House subject to acceptable terms being agreed.

Decision: That Northcott House be leased subject to acceptable terms being agreed with the landlord with a view to using and managing the buildings as ‘step down’ accommodation for vulnerable adults, now deemed able to live independently, pending their move into either a social or private rented tenancy. 2. That authority be delegated to the head of property to agree detailed lease terms and to complete a lease of the premises on the terms (or better) set out the report. Decision page

2 papers, 132 KBSearch inside with Pro
AppendixAppendix 1: Equality impact assessment31 KBDownload
ReportReport: Proposal to Lease Northcott House101 KBDownload
29
Report

Gateway 1 - Procurement Strategy Approval - Appointment of Contractors for Primary Expansion Programme

To approve the procurement strategy for appointment of two contractors for the primary schools expansion programme using the Improvement and Efficiency South East (iESE) construction and management framework arrangements.

Decision: That the procurement strategy for appointment of two contractors for the primary schools expansion programme using the Improvement and Efficiency South East (iESE) construction and management framework arrangements be approved. 2. That it be noted that a contractor will be appointed for each of two packages noted in paragraph 23 of the report for pre-construction services using the iESE contractor framework (estimated value for each package: £0.7m) and a series of works contracts for the... Decision page

1 paper, 174 KBSearch inside with Pro
ReportReport: Gateway 1: Procurement Strategy Approval: Appointment of Contractors for Primary Expansion Programme174 KBDownload
30
Report

Gateway 1 - Procurement Strategy Approval - Heating and Water Contracts

To approve the procurement strategy for two heating and water contracts in the north and south of the borough.

Decision: That the procurement strategy outlined in the report for two heating and water contracts - contract A - north of the borough at an estimated annual cost of £7.9m and contract B - south of the borough at an estimated annual cost of £7.4m , for a period of five years from 1 April 2016 with the potential to extend up to five (three years plus two years), making an estimated value of £153m for the contracts be approved. 2. That the rationale behind the geographical division of contract areas is... Decision page

3 papers, 1.5 MBSearch inside with Pro
ReportBackground document: Heating and Water Gas Contract options appraisal267 KBDownload
ReportBackground document: Individual heating and gas contract price per property: 21 December 20121.1 MBDownload
ReportReport: Gateway 1: Procurement Strategy Approval: Heating and Water Contracts146 KBDownload
31
Exempt parts

Exclusion of Press and Public

That the press and public be excluded from the meeting for the following items of business on the grounds that they involve the likely disclosure of exempt information as defined in category 3 of paragraph 10.4 of the Access to Information Procedure Rules of the Southwark Constitution. The following is a summary of the closed part of the meeting.

31
Procedure

Disposal of Site A - 5 Nunhead Green, London SE15

32
Procedure

Gateway 2 - Contract Award Approval: Lift Maintenance Contract

33
Procedure

Proposal to Lease Northcott House Hostel

Read inside all 60 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

8 contracts

The main business: Next Steps on Developing Long Term Plans for the Delivery of New Council Homes

Item 14 is where most of this meeting's papers sit: 4 papers, about 4.2 MB.

Item 14

Next Steps on Developing Long Term Plans for the Delivery of New Council Homes

To note the progress underway and agree the next steps for the direct delivery programme that forms part of the overall commitment to build 11,000 new council homes over 30 years from 2013 – 2043.

What is in the pack4 papers, about 4.2 MB
Appendix 1
Draft Charter of PrinciplesSupporting paper
75 KB
Appendix 2
Schedule of directly funded housing delivery programme schemesSupporting paper
209 KB
Appendix 3
Details of currently funded housing delivery schemesSupporting paper
3.7 MB
Report
Report: Long term plans for the delivery of new council homesThe report to the committee
162 KB
Read and search every page of this itemPro opens all 4 papers, and keeps them if the council removes them.

How this item got here

This is the first time this subject appears in the meetings we have read.

28 May 2026Next Steps on Developing Long Term Plans for the Delivery of New Council HomesThis meeting.

Every paper for this meeting

All 60 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
105 KB
Kept 5 Nov
Printed minutesItem
186 KB
Kept 5 Nov
Supplemental Agenda No. 1Item
288 KB
Kept 5 Nov
Supplemental Agenda No. 2Item
275 KB
Kept 5 Nov
Five day notice form for agendaItem 3, Notice of Intention to conduct business in a closed meeting, and any representations received
18 KB
Kept 5 Nov
Notification of Closed Business for Urgent Consideration FormItem 3, Notice of Intention to conduct business in a closed meeting, and any representations received
27 KB
Kept 5 Nov
Cabinet minutes open: 2 July 2014Item 6, Minutes
67 KB
Kept 5 Nov
Southwark Community WardensAppendix 1, item 8, Southwark Community Wardens Service (Housing, Environment and Community Safety Scrutiny Sub-Committee)
169 KB
Kept 5 Nov
Report: Southwark Community wardensItem 8, Southwark Community Wardens Service (Housing, Environment and Community Safety Scrutiny Sub-Committee)
60 KB
Kept 5 Nov
Appendix: Mental Health Services BMEItem 9, Prevalence of Psychosis and Access to Mental Health Services for the BME Community in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)
875 KB
Kept 5 Nov
Report: Mental health services BMEItem 9, Prevalence of Psychosis and Access to Mental Health Services for the BME Community in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)
68 KB
Kept 5 Nov
Appendix: Access to Healthcare ServicesItem 10, Access to Health Services in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)
922 KB
Kept 5 Nov
Report: Access health servicesItem 10, Access to Health Services in Southwark (Health, Adult Social Care, Communities & Citizenship Scrutiny Sub-Committee)
63 KB
Kept 5 Nov
Council Plan 2014/15: 2017/18: Indicative Delivery PlanAppendix 2, item 11, Council Plan 2014/15 - 2017/18
118 KB
Kept 5 Nov
Appendix :1 Council Plan 2014/15: 2017/18Item 11, Council Plan 2014/15 - 2017/18
773 KB
Kept 5 Nov
Report: Council Plan 2014/15: 2017/18Item 11, Council Plan 2014/15 - 2017/18
96 KB
Kept 5 Nov
Report: Fairer Future Annual Performance Report 2013/14Item 12, Fairer Future Annual Performance Report 2013/14
83 KB
Kept 5 Nov
Bermondsey BID arrangementsAppendix 1, item 13, Blue Bermondsey Business Improvement District Proposal and Ballot
166 KB
Kept 5 Nov
Bermondsey BID Business SurveyAppendix 2, item 13, Blue Bermondsey Business Improvement District Proposal and Ballot
2.4 MB
Kept 5 Nov
Bermondsey BID Equalities AnalysisAppendix 3, item 13, Blue Bermondsey Business Improvement District Proposal and Ballot
125 KB
Kept 5 Nov
Report: Bermondsey BIDItem 13, Blue Bermondsey Business Improvement District Proposal and Ballot
108 KB
Kept 5 Nov
Draft Charter of PrinciplesAppendix 1, item 14, Next Steps on Developing Long Term Plans for the Delivery of New Council Homes
75 KB
Kept 5 Nov
Schedule of directly funded housing delivery programme schemesAppendix 2, item 14, Next Steps on Developing Long Term Plans for the Delivery of New Council Homes
209 KB
Kept 5 Nov
Details of currently funded housing delivery schemesAppendix 3, item 14, Next Steps on Developing Long Term Plans for the Delivery of New Council Homes
3.7 MB
Kept 5 Nov
Report: Long term plans for the delivery of new council homesItem 14, Next Steps on Developing Long Term Plans for the Delivery of New Council Homes
162 KB
Kept 5 Nov
Report and appendices: Major Works Status Report incorporating Warm Dry and SafeItem 15, Major Works Status Report Incorporating Warm, Dry and Safe
1.2 MB
Kept 5 Nov
Our shared vision for my life at home for people who need careAppendix 1, item 16, Integrated Community Support - A New Commissioning Strategy, underpinned by an Ethical Care Charter
115 KB
Kept 5 Nov
A Set of Values for Home CareAppendix 2, item 16, Integrated Community Support - A New Commissioning Strategy, underpinned by an Ethical Care Charter
47 KB
Kept 5 Nov
Report: Integrated Community SupportItem 16, Integrated Community Support - A New Commissioning Strategy, underpinned by an Ethical Care Charter
164 KB
Kept 5 Nov
Report: School Places Strategy UpdateItem 17, School Places Strategy Update
163 KB
Kept 5 Nov
Report and appendix: Discretionary rate reliefItem 18, Non-Domestic Rates - Discretionary Rate Relief Policy for Retail Relief, Reoccupation Relief and New Build Empty Property Relief
109 KB
Kept 5 Nov
Plan of land to transfer to Lend Lease imminentlyAppendix A, item 19, Elephant and Castle Regeneration Progress
303 KB
Kept 5 Nov
Plan of Heygate land to be appropriatedAppendix B, item 19, Elephant and Castle Regeneration Progress
299 KB
Kept 5 Nov
Rationale for appropriation of Heygate LandAppendix C, item 19, Elephant and Castle Regeneration Progress
30 KB
Kept 5 Nov
Plan of land for replacement Crossways ChurchAppendix D, item 19, Elephant and Castle Regeneration Progress
126 KB
Kept 5 Nov
Rationale for appropriation of land for replacement Crossways ChurchAppendix E, item 19, Elephant and Castle Regeneration Progress
29 KB
Kept 5 Nov
Report: Elephant and CastleItem 19, Elephant and Castle Regeneration Progress
108 KB
Kept 5 Nov
Report: Gateway 1 Abbeyfield Estate HINE (Maydew House) WorksItem 20, Gateway 1 Abbeyfield Estate HINE (Maydew House) Works
138 KB
Kept 5 Nov
Report: Review of voids disposal strategyItem 21, Review of Void Disposal Strategy
126 KB
Kept 5 Nov
General fund summary monitoring positionAppendix A, item 22, Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24
43 KB
Kept 5 Nov
Housing investment programme summary monitoring positionAppendix B, item 22, Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24
27 KB
Kept 5 Nov
Budget virements and variations at quarter 4 2013/14Appendix C, item 22, Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24
25 KB
Kept 5 Nov
General fund programme detailAppendix D, item 22, Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24
33 KB
Kept 5 Nov
Report: 2013-14 Quarter 4 Capital Monitor OutturnItem 22, Quarterly Capital Monitoring Outturn Report for 2013/14 and Capital Programme Refresh for 2013/14 - 2023/24
163 KB
Kept 5 Nov
Budget movements to be approved and notedAppendix A, item 23, Revenue Outturn Report 2013/14, including Treasury Management
80 KB
Kept 5 Nov
Movements in reservesAppendix B, item 23, Revenue Outturn Report 2013/14, including Treasury Management
71 KB
Kept 5 Nov
Report: 2013-14 Outturn: RevenueItem 23, Revenue Outturn Report 2013/14, including Treasury Management
183 KB
Kept 5 Nov
Report: Nominations to CLPE and Safeguarding Adults Partnership BoardItem 24, Nominations to Centre for Literacy in Primary Education and Safeguarding Adults Partnership Board 2014/15
49 KB
Kept 5 Nov
Report: Motions Referred from Council AssemblyItem 25, Motions Referred from Council Assembly
138 KB
Kept 5 Nov
MapAppendix 1, item 26, Disposal of Site A - 5 Nunhead Green, London SE15
159 KB
Kept 5 Nov
Report: Disposal of Nunhead Site AItem 26, Disposal of Site A - 5 Nunhead Green, London SE15
82 KB
Kept 5 Nov
Background document: GW3 Open 25 October 2013Item 27, Gateway 2 - Contract Award Approval: Lift Maintenance Contract
410 KB
Kept 5 Nov
Background document: GW3 Open 7 November 2012Item 27, Gateway 2 - Contract Award Approval: Lift Maintenance Contract
377 KB
Kept 5 Nov
Report: GW2 Lift Maintenance ContractItem 27, Gateway 2 - Contract Award Approval: Lift Maintenance Contract
133 KB
Kept 5 Nov
Equality impact assessmentAppendix 1, item 28, Proposal to Lease Northcott House Hostel
31 KB
Kept 5 Nov
Report: Proposal to Lease Northcott HouseItem 28, Proposal to Lease Northcott House Hostel
101 KB
Kept 5 Nov
Report: Gateway 1: Procurement Strategy Approval: Appointment of Contractors for Primary Expansion ProgrammeItem 29, Gateway 1 - Procurement Strategy Approval - Appointment of Contractors for Primary Expansion Programme
174 KB
Kept 5 Nov
Background document: Heating and Water Gas Contract options appraisalItem 30, Gateway 1 - Procurement Strategy Approval - Heating and Water Contracts
267 KB
Kept 5 Nov
Background document: Individual heating and gas contract price per property: 21 December 2012Item 30, Gateway 1 - Procurement Strategy Approval - Heating and Water Contracts
1.1 MB
Kept 5 Nov
Report: Gateway 1: Procurement Strategy Approval: Heating and Water ContractsItem 30, Gateway 1 - Procurement Strategy Approval - Heating and Water Contracts
146 KB
Kept 5 Nov

This committee over time

Every Cabinet (decommissioned, for the Executive after meeting we have read, the dates it has set for the future, and each time those dates have changed.

102 meetings, 2026 to 2026Dot size shows the number of papers
2026
HeldThis meeting
MeetingItemsPapers
28 May 2026Thursday
32items
64papers
HeldOpen
28 May 2026Thursday
14items
27papers
HeldOpen
28 May 2026Thursday
16items
36papers
HeldOpen
28 May 2026Thursday
28items
62papers
HeldOpen
28 May 2026Thursday
31items
70papers
HeldOpen
28 May 2026Thursday
34items
49papers
HeldOpen
28 May 2026Thursday
24items
49papers
HeldOpen
28 May 2026Thursday
21items
42papers
HeldOpen
28 May 2026Thursday
20items
32papers
HeldOpen
28 May 2026Thursday
27items
44papers
HeldOpen
28 May 2026Thursday
14items
28papers
HeldOpen
28 May 2026Thursday
14items
43papers
HeldOpen
28 May 2026Thursday
25items
45papers
HeldOpen
28 May 2026Thursday
22items
39papers
HeldOpen
28 May 2026Thursday
23items
35papers
HeldOpen
28 May 2026Thursday
26items
49papers
HeldOpen
28 May 2026Thursday
5items
7papers
HeldOpen
28 May 2026Thursday
22items
33papers
HeldOpen
28 May 2026Thursday
0items
0papers
HeldOpen
28 May 2026Thursday
17items
21papers
HeldOpen
28 May 2026Thursday
27items
51papers
HeldOpen
28 May 2026Thursday
13items
23papers
HeldOpen
28 May 2026Thursday
20items
36papers
HeldOpen
28 May 2026Thursday
18items
32papers
HeldOpen
28 May 2026Thursday
31items
50papers
HeldOpen
28 May 2026Thursday
27items
58papers
HeldOpen
28 May 2026Thursday
24items
38papers
HeldOpen
28 May 2026Thursday
15items
19papers
HeldOpen
28 May 2026Thursday
15items
16papers
HeldOpen
28 May 2026Thursday
0items
0papers
HeldOpen
28 May 2026Thursday
0items
0papers
HeldOpen
28 May 2026Thursday
21items
42papers
HeldOpen
28 May 2026Thursday
27items
39papers
HeldOpen
28 May 2026Thursday
22items
42papers
HeldOpen
28 May 2026Thursday
24items
43papers
HeldOpen
28 May 2026Thursday
19items
36papers
HeldOpen
28 May 2026Thursday, this meeting
34items
60papers
28 May 2026Thursday
20items
27papers
HeldOpen
28 May 2026Thursday
12items
9papers
HeldOpen
28 May 2026Thursday
21items
27papers
HeldOpen
28 May 2026Thursday
7items
5papers
HeldOpen
28 May 2026Thursday
26items
47papers
HeldOpen
28 May 2026Thursday
0items
0papers
HeldOpen
28 May 2026Thursday
0items
0papers
HeldOpen
28 May 2026Thursday
0items
0papers
HeldOpen
28 May 2026Thursday
22items
50papers
HeldOpen
28 May 2026Thursday
21items
39papers
HeldOpen
28 May 2026Thursday
17items
29papers
HeldOpen
28 May 2026Thursday
22items
41papers
HeldOpen
28 May 2026Thursday
28items
57papers
HeldOpen
28 May 2026Thursday
28items
35papers
HeldOpen
28 May 2026Thursday
27items
46papers
HeldOpen
28 May 2026Thursday
20items
30papers
HeldOpen
28 May 2026Thursday
22items
32papers
HeldOpen
28 May 2026Thursday
19items
36papers
HeldOpen
28 May 2026Thursday
17items
39papers
HeldOpen
28 May 2026Thursday
25items
54papers
HeldOpen
28 May 2026Thursday
26items
65papers
HeldOpen
28 May 2026Thursday
24items
34papers
HeldOpen
28 May 2026Thursday
23items
37papers
HeldOpen
28 May 2026Thursday
20items
41papers
HeldOpen
28 May 2026Thursday
17items
31papers
HeldOpen
28 May 2026Thursday
28items
46papers
HeldOpen
28 May 2026Thursday
8items
18papers
HeldOpen
28 May 2026Thursday
24items
41papers
HeldOpen
28 May 2026Thursday
20items
18papers
HeldOpen
28 May 2026Thursday
27items
36papers
HeldOpen
28 May 2026Thursday
24items
37papers
HeldOpen
28 May 2026Thursday
19items
29papers
HeldOpen
28 May 2026Thursday
20items
31papers
HeldOpen
28 May 2026Thursday
33items
61papers
HeldOpen
28 May 2026Thursday
9items
16papers
HeldOpen
28 May 2026Thursday
8items
6papers
HeldOpen
28 May 2026Thursday
4items
5papers
HeldOpen
28 May 2026Thursday
4items
5papers
HeldOpen
28 May 2026Thursday
5items
6papers
HeldOpen
28 May 2026Thursday
5items
7papers
HeldOpen
28 May 2026Thursday
5items
7papers
HeldOpen
28 May 2026Thursday
5items
10papers
HeldOpen
28 May 2026Thursday
19items
28papers
HeldOpen
28 May 2026Thursday
27items
54papers
HeldOpen
28 May 2026Thursday
20items
35papers
HeldOpen
28 May 2026Thursday
28items
34papers
HeldOpen
28 May 2026Thursday
13items
17papers
HeldOpen
28 May 2026Thursday
18items
24papers
HeldOpen
28 May 2026Thursday
21items
36papers
HeldOpen
28 May 2026Thursday
23items
27papers
HeldOpen
28 May 2026Thursday
19items
28papers
HeldOpen
28 May 2026Thursday
13items
19papers
HeldOpen
28 May 2026Thursday
12items
16papers
HeldOpen
28 May 2026Thursday
17items
21papers
HeldOpen
28 May 2026Thursday
16items
21papers
HeldOpen
28 May 2026Thursday
20items
41papers
HeldOpen
28 May 2026Thursday
17items
33papers
HeldOpen
28 May 2026Thursday
15items
30papers
HeldOpen
28 May 2026Thursday
22items
43papers
HeldOpen
28 May 2026Thursday
23items
24papers
HeldOpen
28 May 2026Thursday
20items
40papers
HeldOpen
28 May 2026Thursday
18items
17papers
HeldOpen
28 May 2026Thursday
19items
25papers
HeldOpen
28 May 2026Thursday
18items
38papers
HeldOpen
28 May 2026Thursday
21items
48papers
HeldOpen

Follow the Cabinet (decommissioned, for the Executive after

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Southwark, Cabinet (decommissioned, for the Executive after

Cabinet (decommissioned, for the Executive after: 3 kinds of updateSouthwark, sent the same day
PDF
60 papers published for 28 MayNext Steps on Developing Long Term Plans for the Delivery of New Council Homes and 59 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 28 MayThe committee's resolutions, the day they are recorded
ABC
Your words found in the papersEvery match, with the page it is on
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Cabinet (decommissioned, for the Executive after, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies